Project name |
Building of a multi level parking |
Location of the project |
Armavir Ñity |
Industry classification |
Consumer sphere |
Basic information about the project |
Project essence |
The project assumes to build up a warmed five storied building made of solid steel concrete. The size of the car area of the parking is - 2,5m õ 6m, height of the ceiling is - 2,8 m In a cold season of the year the parking will have a temperature not less then +7°Ñ. |
Project capacity |
The parking for 432 car places will be located on 5 stories. |
Financial estimation of the project |
Total cost of the project, mln rubles |
112 mln.rub |
Investment capacity, mln rubles |
112 mln.rub |
Conditions of investor participation |
Direct investments |
Payback period |
4,4 years |
Land characteristics |
Location |
Armavir, 4-20 str, Frunze |
Land plot area (m2) |
10 000 m2 |
Ground categories |
Land of settlements |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
VL 6kW |
Along the board of the site |
Gas supply |
.D=114 |
202 |
Water supply |
D=300 |
Along the board of the site |
Sewerage system |
D=200 |
98 |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
The central part of Armavir |
Located in the central part of the city |
Center of federal subject |
Armavir |
250 |
Highway (regional, federal significance) |
FAD «Caucasus» |
7,2 |
Roads of local significance |
«an entrance to Armavir» |
Along the board of the site |
Nearest railway station |
Railway station «Armavir-1», Railway station «Armavir-2» |
1,0 , 5,2 |
Nearest railway lines |
|
0,5 |
Airport |
An airport of Krasnodar |
200 |
Seaport |
Novorossijsk |
360 |