Construction of a logistic center

Project name Construction of a logistic center
Location of the project Uspenskiy district
Industry classification Transport and communication
Basic information about the project
Project essence Selection of a vehicle type; The routes determination; Packing of the goods in containers; Inventory control; Responsible storage on the warehouse areas; Marking; Formation of combined orders; Customs services.
Project capacity Logistical services have no obviously expressed seasonal nature. In a warm season the volume of rendering of logistical services increases a little.
Financial estimation of the project
Total cost of the project, mln rubles 245,0 mln.rub
Investment capacity, mln rubles 245,0 mln.rub
Conditions of investor participation Direct investment
Payback period 6,3
Land characteristics
Location Krasnodar region, Uspensky district, bowery Volnost
Land plot area (m2) 80 000 sq.m.
Ground categories Lands of settlement.
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply TS 10/0,4 kW, 10 kW 1400
Gas supply D=89 mm 350
Water supply D=100 mm 8000
Sewerage system Local -
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center central part of the v.Uspenskoe 25
Center of federal subject City Krasnodar 270
Highway (regional, federal significance) Federal road “Caucasus” 0,1
Roads of local significance «Armavir-Uspenskoe» 1
Nearest railway station rail road station “Konokovo” 27
Nearest railway lines - 20
Airport Airport – city Krasnodar 270
Seaport city Novorossisk 380