Construction of the second cargo area of seaport Yeisk in area of the Kamyshevatskaya spit

Project name Construction of the second cargo area of seaport Yeisk in area of the Kamyshevatskaya spit
Location of the project Yeisk district
Industry classification Transport and communication
Basic information about the project
Project essence The project plans construction of port for transshipment through the 14 mooring up to 12 millions tons of cargo in year.
Project capacity Annual value transshipment – 12 mln/t cargoes
Financial estimation of the project
Total cost of the project, mln rubles 20 700 mln. rub.
Investment capacity, mln rubles 20 700 mln. rub.
Conditions of investor participation Direct investments
Payback period 7,8 years
Land characteristics
Location Russia, Krasnodar territory, Yeisk district Kamyshevatskaya village
Land plot area (m2) 1300000
Ground categories Stock lands
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply P/S 35/10 Kv, 1 MVt 4800
Gas supply 10.0 kg/sm in a day, O150 mm 4500
Water supply 50 cub. m. in a day O100 3000
Sewerage system Absent Local sewage water drain
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center City Yeisk 47
Center of federal subject city Krasnodar 287
Highway (regional, federal significance) Yeisk – Kamishevatskaya 7
Roads of local significance Morskaya St 2
Nearest railway station City Yeisk, railway station 55
Nearest railway lines City Yeisk, railway station 55
Airport City Yeisk 50
Seaport City Yeisk 55