Building of objects òåõíîñåðâèñà

Basic information about ground area
The planned use of land Building of objects òåõíîñåðâèñà
Location of the project Sherbinovskiy district
Address of the location Krasnodar territory, Shcherbinovsky area, village Ekaterinovka, northern part of settlement from a West side of a motorway with. Åêàòåðèíîâêà – õ. Red Gift
Cadastral number of quarter 23:36:05 03 002
Area of the declared (ì2) 10 000
Category of the earths The earths of settlements
Kind of permitted use For placing of objects Roadside service
Actual use Free from building
Availability of buildings, structures, constructions -
Authorizations, urban planning documentation The project of a lay-out and building of village Ekaterinovka of collective farm of Shevchenko confirmed by the Krasnodar Executive Committee in 1972
Information about the proprietor (legal owner) of the ground area
Proprietor State ownership
Legal owner Municipal union administration Shcherbinovsky area
Kind of rights It is not registered
Information about burden
Kind of burden, restrictions Gas pipeline of average pressure, waterpipe
Area of burden 100 sq.m.
The characteristic of existing engineering infrastructure
Kind of infrastructureCapacity, diameterDistance to a connection point (m)
Electrical supply LEP - 10 kV 50
Gas supply d=80 350
Water supply d=100 50
Water drain Local treatment facilities -
Installation of telephones Multichannel cable 300
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) 0,6
Distance till large settlements and objects of transport infrastructure
Remoteness fromThe nameDistance (km)
Center of municipal union Village Staroshcherbinovsky 23
Center of the subject of federation The city of Krasnodar 245
Highways (regional, federal value) Highway of regional value Krasnodar - Yeysk 23
Highways of local value Motorway Åêàòåðèíîâêà – Red Gift 0,05
The nearest railway station Railway station a village Staroshcherbinovsky 22
Nearest tracks Village Staroshcherbinovsky 21,5
Airport The city of Yeysk 62
Seaport The city of Yeysk 60
The additional information about ground area
Special conditions The topographical and engineering-geological level of scrutiny is not present, seismicity of 6 points on MSK
Cost of rent/repayment of ground area (million rubles) Rent – 0,12 The repayment – 0,5
Notes -