Apartment block placement

Basic information about ground area
The planned use of land Apartment block placement
Location of the project Ust- Labinskiy district
Address of the location t. Ust-Labinsk, block ¹ 305, area ¹3
Area of the declared (ì2) 14 520 sq.ì.
Category of the earths Area of settlements
The characteristic of existing engineering infrastructure
Kind of infrastructureCapacity, diameterDistance to a connection point (m)
Electrical supply 150 kWt Separated cell ÏÑ 35/10 kV «Ust-Labinsk-2», 3000 m
Gas supply Du 325, 16 atmospheres From the building high-pressure gas pipeline Du 325 town’s net Ust-Labinsk, 200 m
Water supply O 250 mm Connecting to the water pipeline Vigonnaya Str. 300 m
Water drain local
Distance till large settlements and objects of transport infrastructure
Remoteness fromThe nameDistance (km)
Center of municipal union t. Ust-Labinsk 3,7
Center of the subject of federation c. Krasnodar 65
Highways (regional, federal value) Temryuk-Krasnodar-Kropotkin 2
Highways of local value Volnaya Str. 0,9
The nearest railway station t. Ust-Labinsk 3,2
Nearest tracks t. Ust-Labinsk 1,2
Airport c. Krasnodar 50
Seaport c. Novorossiysk 230
The additional information about ground area
Notes Ust-Labinsk District Municipal Formation Authority Telephone/fax: +7(86135) 4-12-03 adminustlab@rambler.ru www.ustlabinvest.ru The Construction Department of the Krasnodar Region Phone/Fax 262-28-57 (secretary) Official E-mail: ds@kràsnodar.r