Basic information about ground area |
The planned use of land |
Hotel placement |
Location of the project |
Ust- Labinskiy district |
Address of the location |
The town of Ust-Labinsk, central part, Kommunisticheskaya Str., |
Cadastral number of quarter |
23:35:0522007:50 |
Area of the declared (ì2) |
14253 |
Category of the earths |
Area of settlements |
Kind of permitted use |
Hotel placement |
Actual use |
Not occupied |
Availability of buildings, structures, constructions |
None |
Authorizations, urban planning documentation |
General plan of the Ust-Labinsk settlement of the Ust-Labinsk District with reference to a part of Ust-Labinsk territory is developed by State Unitary Enterprise “Institute of the Krasnodar Region Territory Development”, authorized by the decision of the Ust-Labinsk settlement Council of the Ust-Labinsk District, dated 31.07.2007 ¹ 14, report of proceeding ¹ 2; “Rules of Land Tenure and Building of Tterritory of Ust-Labinsk District, Krasnodar Region with Reference to a Part of Territory of Settlement – t. Ust-Labinsk”, developed by the Kuban state agrarian university, authorized by the decision of the Ust-Labinsk settlement Council of the Ust-Labinsk District, dated 25.11.2008 ¹ 2, report of proceeding ¹ 35. According to the project of general plan updating of the Ust-Labinsk settlement of the Ust-Labinsk District with reference to a part of Ust-Labinsk territory, the coordination taking place in a stage, the territorial zone will meet allowed use of the ground area. |
Information about the proprietor (legal owner) of the ground area |
Proprietor |
Russian Federation |
Legal owner |
Ust-Labinsk District Municipal Formation |
Kind of rights |
- |
Information about burden |
Kind of burden, restrictions |
None |
Area of burden |
None |
The characteristic of existing engineering infrastructure |
Kind of infrastructure | Capacity, diameter | Distance to a connection point (m) |
Electrical supply |
300 kilowatt |
Kommunisticheskaya Str., 250 m |
Gas supply |
From the designed gas pipeline O 325ìì |
Kommunisticheskaya Str., 400 m |
Water supply |
1,5 atmospheres, Tube O 200 mm |
Kommunisticheskaya Str.,50 m |
Water drain |
O 300 mm |
Lenin Str. 300 m |
Installation of telephones |
- |
Lenin Str. 100 m |
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) |
Water supply - 0,3; Sewerage - 0,5; Electro supply — 0,3; Heat supply – 0,3; Gas supply – 1,2; Telephone installation - 0,5. |
Distance till large settlements and objects of transport infrastructure |
Remoteness from | The name | Distance (km) |
Center of municipal union |
t. Ust-Labinsk |
0,2 |
Center of the subject of federation |
c. Krasnodar |
65 |
Highways (regional, federal value) |
Temryuk-Krasnodar-Kropotkin |
3,8 |
Highways of local value |
Volnaya Str. |
2,9 |
The nearest railway station |
t. Ust-Labinsk |
1,6 |
Nearest tracks |
t. Ust-Labinsk |
1,3 |
Airport |
c. Krasnodar |
50 |
Seaport |
c. Novorossiysk |
230 |
The additional information about ground area |
Special conditions |
The relief is mostly flat, subsoil waters is lower than 6 meters, subsidental subsoil, seismicity of the area - 8 points |
Cost of rent/repayment of ground area (million rubles) |
0,372 |
Notes |
- |