Hotel placement

Basic information about ground area
The planned use of land Hotel placement
Location of the project Ust- Labinskiy district
Address of the location The town of Ust-Labinsk, central part, Kommunisticheskaya Str.,
Cadastral number of quarter 23:35:0522007:50
Area of the declared (ì2) 14253
Category of the earths Area of settlements
Kind of permitted use Hotel placement
Actual use Not occupied
Availability of buildings, structures, constructions None
Authorizations, urban planning documentation General plan of the Ust-Labinsk settlement of the Ust-Labinsk District with reference to a part of Ust-Labinsk territory is developed by State Unitary Enterprise “Institute of the Krasnodar Region Territory Development”, authorized by the decision of the Ust-Labinsk settlement Council of the Ust-Labinsk District, dated 31.07.2007 ¹ 14, report of proceeding ¹ 2; “Rules of Land Tenure and Building of Tterritory of Ust-Labinsk District, Krasnodar Region with Reference to a Part of Territory of Settlement – t. Ust-Labinsk”, developed by the Kuban state agrarian university, authorized by the decision of the Ust-Labinsk settlement Council of the Ust-Labinsk District, dated 25.11.2008 ¹ 2, report of proceeding ¹ 35. According to the project of general plan updating of the Ust-Labinsk settlement of the Ust-Labinsk District with reference to a part of Ust-Labinsk territory, the coordination taking place in a stage, the territorial zone will meet allowed use of the ground area.
Information about the proprietor (legal owner) of the ground area
Proprietor Russian Federation
Legal owner Ust-Labinsk District Municipal Formation
Kind of rights -
Information about burden
Kind of burden, restrictions None
Area of burden None
The characteristic of existing engineering infrastructure
Kind of infrastructureCapacity, diameterDistance to a connection point (m)
Electrical supply 300 kilowatt Kommunisticheskaya Str., 250 m
Gas supply From the designed gas pipeline O 325ìì Kommunisticheskaya Str., 400 m
Water supply 1,5 atmospheres, Tube O 200 mm Kommunisticheskaya Str.,50 m
Water drain O 300 mm Lenin Str. 300 m
Installation of telephones - Lenin Str. 100 m
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) Water supply - 0,3; Sewerage - 0,5; Electro supply — 0,3; Heat supply – 0,3; Gas supply – 1,2; Telephone installation - 0,5.
Distance till large settlements and objects of transport infrastructure
Remoteness fromThe nameDistance (km)
Center of municipal union t. Ust-Labinsk 0,2
Center of the subject of federation c. Krasnodar 65
Highways (regional, federal value) Temryuk-Krasnodar-Kropotkin 3,8
Highways of local value Volnaya Str. 2,9
The nearest railway station t. Ust-Labinsk 1,6
Nearest tracks t. Ust-Labinsk 1,3
Airport c. Krasnodar 50
Seaport c. Novorossiysk 230
The additional information about ground area
Special conditions The relief is mostly flat, subsoil waters is lower than 6 meters, subsidental subsoil, seismicity of the area - 8 points
Cost of rent/repayment of ground area (million rubles) 0,372
Notes -