Basic information about ground area |
The planned use of land |
Gas Station ¹ 36 placement |
Location of the project |
Ust- Labinskiy district |
Address of the location |
Stanitsa Nekrasovskaya, motorway Ust-Labinsk – Upornaya 13 km + 200 ì (to the right) |
Cadastral number of quarter |
23:35:1510003:14 |
Area of the declared (ì2) |
4000 |
Category of the earths |
Area of settlements |
Kind of permitted use |
Gas Station placement |
Actual use |
Not occupied |
Availability of buildings, structures, constructions |
None |
Authorizations, urban planning documentation |
Gas Station Drawings of the Ust-Labinsk District Municipal Formation |
Information about the proprietor (legal owner) of the ground area |
Proprietor |
Russian Federation |
Legal owner |
Ust-Labinsk District Municipal Formation |
Kind of rights |
- |
Information about burden |
Kind of burden, restrictions |
None |
Area of burden |
None |
The characteristic of existing engineering infrastructure |
Kind of infrastructure | Capacity, diameter | Distance to a connection point (m) |
Electrical supply |
70 kilowatt |
Integrated poultry farm network 0,5 km |
Gas supply |
Not required |
|
Water supply |
1,5 atmospheres, Tube O 100 mm |
Integrated poultry farm network 0,5 km |
Water drain |
|
Local |
Installation of telephones |
- |
2,0 km |
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) |
Water supply - 0,4; Sewerage - 0,2; Electro supply — 0,3; Gas supply - not required; Telephone installation - 0,2 |
Distance till large settlements and objects of transport infrastructure |
Remoteness from | The name | Distance (km) |
Center of municipal union |
t. Ust-Labinsk |
10,6 |
Center of the subject of federation |
c. Krasnodar |
65 |
Highways (regional, federal value) |
Ust-Labinsk – Upornaya |
0,02 |
Highways of local value |
- |
|
The nearest railway station |
t. Ust-Labinsk |
12,0 |
Nearest tracks |
t. Ust-Labinsk |
12,0 |
Airport |
c. Krasnodar |
85 |
Seaport |
c. Novorossiysk |
250 |
The additional information about ground area |
Special conditions |
The relief is mostly flat, subsoil waters is lower than 7 meters, subsidental subsoil, seismicity of the area - 8 points |
Cost of rent/repayment of ground area (million rubles) |
0,02 |
Notes |
- |