Basic information about ground area |
The planned use of land |
The block of green houses for vegetable production |
Location of the project |
Uspenskiy district |
Address of the location |
Krasnodar region, Uspensky district, village Uspenskoe, industrial zone (from the south side is join to territory of Uspensky sugar factory, from the north – Lenina str., from the west – the territory of sugar factory, from the east - park). |
Cadastral number of quarter |
23:34:02 01 000: |
Area of the declared (ě2) |
20 000 |
Category of the earths |
Lands of industry. |
Kind of permitted use |
Lands for construction of industrial objects. |
Actual use |
Under gardens. |
Availability of buildings, structures, constructions |
- |
Authorizations, urban planning documentation |
The general plan of village Uspenskoe,1977, «Krasnodargrajdanproekt». |
Information about the proprietor (legal owner) of the ground area |
Proprietor |
State property |
Legal owner |
Municipal formation. |
Kind of rights |
State property before delimitation. |
Information about burden |
Kind of burden, restrictions |
Absent |
Area of burden |
- |
The characteristic of existing engineering infrastructure |
Kind of infrastructure | Capacity, diameter | Distance to a connection point (m) |
Electrical supply |
0,4 kW |
10 |
Gas supply |
D=89mm |
60 |
Water supply |
D=100mm |
30 |
Water drain |
Local |
- |
Installation of telephones |
- |
Connection according to specifications of OJSC “UTK” |
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) |
0,166 |
Distance till large settlements and objects of transport infrastructure |
Remoteness from | The name | Distance (km) |
Center of municipal union |
v.Uspenskoe |
3 km |
Center of the subject of federation |
City Krasnodar |
269 km |
Highways (regional, federal value) |
Federal road “Caucasus” |
3 km |
Highways of local value |
«Uspenskoe-Armavir» |
22 km |
The nearest railway station |
rail road station “Konokovo” |
2 km |
Nearest tracks |
- |
2 km |
Airport |
Airport – city Mineralnie Vody |
150 km |
Seaport |
city Novorossisk |
400 km |
The additional information about ground area |
Special conditions |
The relief of the ground is calm, plain with general incline aside to the river Kuban, according to the data of technical report made by Armavir branch of trust “Sevkavtezis”- the level of underground water 2 m. from the level of land surface, bogginess is not present, soil set by loam brownish-grey, the category of complication of soil –II, seismicity of the ground: 7 points on the Richter scale. |
Cost of rent/repayment of ground area (million rubles) |
110,0/190,0 |
Notes |
- |