Basic information about ground area |
The planned use of land |
The market on trade food and industrial goods |
Location of the project |
Uspenskiy district |
Address of the location |
Krasnodar region, Uspensky district, village Konokovo, east microdistrict. |
Cadastral number of quarter |
23:34: 09 02 008 |
Area of the declared (ì2) |
1 365 |
Category of the earths |
Lands of settlement. |
Kind of permitted use |
The zone of housing estate |
Actual use |
Free territory |
Availability of buildings, structures, constructions |
- |
Authorizations, urban planning documentation |
The location of the object corresponds to the project of building of east part of village Konokovo under construction of housing for citizens, who suffered from flow in July 2002, confirmed by decision of session of Uspensky district Council of deputes at 31.07.2002, ¹84. |
Information about the proprietor (legal owner) of the ground area |
Proprietor |
State property |
Legal owner |
Municipal formation. |
Kind of rights |
State property before delimitation. |
Information about burden |
Kind of burden, restrictions |
Absent |
Area of burden |
- |
The characteristic of existing engineering infrastructure |
Kind of infrastructure | Capacity, diameter | Distance to a connection point (m) |
Electrical supply |
0,4 kW |
5 |
Gas supply |
D=150mm |
10 |
Water supply |
D=100mm |
10 |
Water drain |
local |
- |
Installation of telephones |
- |
Connection according to specification of OJSC “UTK” |
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) |
0,37 |
Distance till large settlements and objects of transport infrastructure |
Remoteness from | The name | Distance (km) |
Center of municipal union |
v.Uspenskoe |
1 km |
Center of the subject of federation |
City Krasnodar |
269km |
Highways (regional, federal value) |
Federal road “Caucasus” |
3 km |
Highways of local value |
«Uspenskoe-Armavir» |
0,1 km |
The nearest railway station |
rail road station “Konokovo” |
2 km |
Nearest tracks |
- |
2 km |
Airport |
Airport – city Mineralnie Vody |
180 km |
Seaport |
city Novorossisk |
360 km |
The additional information about ground area |
Special conditions |
The relief of the ground is calm, plain with general incline aside to the ponds at the river Beichug on the west fringe of microdistrict, according to the data of technical report made by Armavir branch of trust “Sevkavtezis”- the level of underground water on the period of research – 3,0 m. Soil present by loam brownish-grey, highly-porous, with layer thickness from 0,9-3,0. The soil is not settle. Seismicity of the ground: 7 points on the Richter scale. |
Cost of rent/repayment of ground area (million rubles) |
15,0/460,0 |
Notes |
- |