The construction of service station for buses and heavy haulers

Basic information about ground area
The planned use of land The construction of service station for buses and heavy haulers
Location of the project Uspenskiy district
Address of the location Krasnodar region, Uspensky district, 192 km. of Federal highway “Caucasus”.
Cadastral number of quarter 23:34:02 05 000:
Area of the declared (ì2) 140 000
Category of the earths Reserve lands.
Kind of permitted use Processing area.
Actual use -
Availability of buildings, structures, constructions -
Authorizations, urban planning documentation The project of an area planning of Uspensky district, Krasnodar region, “Kubangiproselhozstroy”, 1985, Krasnodar.
Information about the proprietor (legal owner) of the ground area
Proprietor State property
Legal owner Municipal formation.
Kind of rights State property before delimitation.
Information about burden
Kind of burden, restrictions Absent
Area of burden -
The characteristic of existing engineering infrastructure
Kind of infrastructureCapacity, diameterDistance to a connection point (m)
Electrical supply TS 10/0,4 kW, 10 kWt 3200
Gas supply D=89mm 1500
Water supply D=100mm 3200
Water drain Local disposal system -
Installation of telephones - Connection according to specification of OJSC “UTK”
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) 10,04
Distance till large settlements and objects of transport infrastructure
Remoteness fromThe nameDistance (km)
Center of municipal union v.Uspenskoe 2,5 km
Center of the subject of federation City Krasnodar 269 km
Highways (regional, federal value) Federal road “Caucasus” 0,38 km
Highways of local value «Uspenskoe-Armavir» 5 km
The nearest railway station rail road station “Konokovo” 7 km
Nearest tracks - 7 km
Airport Airport – city Krasnodar 269 km
Seaport city Novorossisk 410 km
The additional information about ground area
Special conditions The relief of the ground is calm, the soil mostly present by loam soft pliable; fine sand grayish-brown; pebble soil with sand filler. Underground water level is 1,5 m. Seismicity of ground: 7 points on the Richter scale.
Cost of rent/repayment of ground area (million rubles) 840,0/1600
Notes -