Basic information about ground area |
The planned use of land |
The construction of service station for buses and heavy haulers |
Location of the project |
Uspenskiy district |
Address of the location |
Krasnodar region, Uspensky district, 192 km. of Federal highway “Caucasus”. |
Cadastral number of quarter |
23:34:02 05 000: |
Area of the declared (ì2) |
140 000 |
Category of the earths |
Reserve lands. |
Kind of permitted use |
Processing area. |
Actual use |
- |
Availability of buildings, structures, constructions |
- |
Authorizations, urban planning documentation |
The project of an area planning of Uspensky district, Krasnodar region, “Kubangiproselhozstroy”, 1985, Krasnodar. |
Information about the proprietor (legal owner) of the ground area |
Proprietor |
State property |
Legal owner |
Municipal formation. |
Kind of rights |
State property before delimitation. |
Information about burden |
Kind of burden, restrictions |
Absent |
Area of burden |
- |
The characteristic of existing engineering infrastructure |
Kind of infrastructure | Capacity, diameter | Distance to a connection point (m) |
Electrical supply |
TS 10/0,4 kW, 10 kWt |
3200 |
Gas supply |
D=89mm |
1500 |
Water supply |
D=100mm |
3200 |
Water drain |
Local disposal system |
- |
Installation of telephones |
- |
Connection according to specification of OJSC “UTK” |
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) |
10,04 |
Distance till large settlements and objects of transport infrastructure |
Remoteness from | The name | Distance (km) |
Center of municipal union |
v.Uspenskoe |
2,5 km |
Center of the subject of federation |
City Krasnodar |
269 km |
Highways (regional, federal value) |
Federal road “Caucasus” |
0,38 km |
Highways of local value |
«Uspenskoe-Armavir» |
5 km |
The nearest railway station |
rail road station “Konokovo” |
7 km |
Nearest tracks |
- |
7 km |
Airport |
Airport – city Krasnodar |
269 km |
Seaport |
city Novorossisk |
410 km |
The additional information about ground area |
Special conditions |
The relief of the ground is calm, the soil mostly present by loam soft pliable; fine sand grayish-brown; pebble soil with sand filler. Underground water level is 1,5 m. Seismicity of ground: 7 points on the Richter scale. |
Cost of rent/repayment of ground area (million rubles) |
840,0/1600 |
Notes |
- |