The factory on processing and recycling of waste and landfill for disposal of 15% fractions of household waste.

Basic information about ground area
The planned use of land The factory on processing and recycling of waste and landfill for disposal of 15% fractions of household waste.
Location of the project Uspenskiy district
Address of the location Krasnodar region, Uspensky district, in 200 m. from the road “Armavir-Uspenskoe-Nevinnomisk”.
Cadastral number of quarter 23:34: 10 02 005:
Area of the declared (ě2) 90 000
Category of the earths Agricultural lands.
Kind of permitted use Under agricultural use.
Actual use Dump of household waste
Availability of buildings, structures, constructions -
Authorizations, urban planning documentation The project of an area planning of Uspensky administrative district.
Information about the proprietor (legal owner) of the ground area
Proprietor State property
Legal owner Municipal formation.
Kind of rights State property before delimitation.
Information about burden
Kind of burden, restrictions Absent
Area of burden -
The characteristic of existing engineering infrastructure
Kind of infrastructureCapacity, diameterDistance to a connection point (m)
Electrical supply 35 kWt 2800
Gas supply D=89mm 3200
Water supply D=100mm 2700
Water drain local disposal works -
Installation of telephones - Connection according to specification of OJSC “UTK”
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) 12,44
Distance till large settlements and objects of transport infrastructure
Remoteness fromThe nameDistance (km)
Center of municipal union v.Uspenskoe 20 km
Center of the subject of federation City Krasnodar 230 km
Highways (regional, federal value) Federal road “Caucasus” 20 km
Highways of local value «Uspenskoe-Armavir» 0,2 km
The nearest railway station rail road station “Konokovo” 10 km
Nearest tracks - 3 km
Airport Airport – city Mineralnie Vody 200 km
Seaport city Novorossisk 380 km
The additional information about ground area
Special conditions The relief of the ground is calm, plain with general incline aside to the river Kuban, according to the data of technical report made by Armavir branch of trust “Sevkavtezis”- the level of underground water on the period of research – 1,5 m. Soil present by loam and clay, under laying by gravel soil with sand filler. The soil is settle, seismicity of the ground: 7 points on the Richter scale.
Cost of rent/repayment of ground area (million rubles) 5,0/440,0
Notes -