Basic information about ground area |
The planned use of land |
The ground under construction of automobile showroom with service station |
Location of the project |
Uspenskiy district |
Address of the location |
Krasnodar region, Uspensky district, the east part of village Konokovo, industrial zone |
Cadastral number of quarter |
23:34 09 01 000 |
Area of the declared (ě2) |
1 820 |
Category of the earths |
Industrial lands. |
Kind of permitted use |
Processing area. |
Actual use |
Free territory |
Availability of buildings, structures, constructions |
- |
Authorizations, urban planning documentation |
The general project of village Konokovo. The project of construction of the east microdistrict (2002). |
Information about the proprietor (legal owner) of the ground area |
Proprietor |
State property |
Legal owner |
Municipal formation. |
Kind of rights |
State property before delimitation. |
Information about burden |
Kind of burden, restrictions |
Absent |
Area of burden |
- |
The characteristic of existing engineering infrastructure |
Kind of infrastructure | Capacity, diameter | Distance to a connection point (m) |
Electrical supply |
0,4 kW, 10 kW |
35 |
Gas supply |
D=100 mm |
55 |
Water supply |
D=100 mm |
50 |
Water drain |
Local disposal system |
- |
Installation of telephones |
- |
Connection according to specification of OJSC “UTK” |
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) |
0,195 |
Distance till large settlements and objects of transport infrastructure |
Remoteness from | The name | Distance (km) |
Center of municipal union |
v.Uspenskoe |
3 km |
Center of the subject of federation |
City Krasnodar |
250 km |
Highways (regional, federal value) |
Federal road “Caucasus” |
3 km |
Highways of local value |
«Uspenskoe-Armavir» |
0,1 km |
The nearest railway station |
rail road station “Konokovo” |
2 km |
Nearest tracks |
- |
2 km |
Airport |
Airport – city Mineralnie Vody |
165 km |
Seaport |
city Novorossisk |
390 km |
The additional information about ground area |
Special conditions |
The relief of the ground is calm, plain, according to the data of technical report made by Armavir branch of trust “Sevkavtezis”- the level of underground water 3 m., on its geomorphological structure the ground is getting in II above flood-plain terrace of the river Kuban and set by loam brownish-grey, highly porous, with layer thickness from 0,9-3,0 m., seismicity of the ground: 7 points on the Richter scale. |
Cost of rent/repayment of ground area (million rubles) |
6,0/300 |
Notes |
- |