Basic information about ground area |
The planned use of land |
The ground under construction of two 36 apartment houses in the village Uspenskoe, Krupskaya str. |
Location of the project |
Uspenskiy district |
Address of the location |
Krasnodar region, Uspensky district, village Uspenskoe, Krupskaya str. |
Cadastral number of quarter |
23:34:02 03 003 |
Area of the declared (ì2) |
6837 |
Category of the earths |
Lands of settlement. |
Kind of permitted use |
The zone of housing estate |
Actual use |
Free territory |
Availability of buildings, structures, constructions |
- |
Authorizations, urban planning documentation |
The General plan of village Uspenskoe 1977 “Krasnodargrajdanproekt”. |
Information about the proprietor (legal owner) of the ground area |
Proprietor |
State property |
Legal owner |
Municipal formation. |
Kind of rights |
State property before delimitation. |
Information about burden |
Kind of burden, restrictions |
Absent |
Area of burden |
- |
The characteristic of existing engineering infrastructure |
Kind of infrastructure | Capacity, diameter | Distance to a connection point (m) |
Electrical supply |
10/0,4 kWt |
12,5 |
Gas supply |
D=159mm |
55 |
Water supply |
D=100 mm |
35 |
Water drain |
D=300 mm |
65 |
Installation of telephones |
- |
Connection according to specification of OJSC “UTK” |
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) |
0,2165 |
Distance till large settlements and objects of transport infrastructure |
Remoteness from | The name | Distance (km) |
Center of municipal union |
v.Uspenskoe |
0,5 km |
Center of the subject of federation |
City Krasnodar |
250 km |
Highways (regional, federal value) |
Federal road “Caucasus” |
3 km |
Highways of local value |
«Uspenskoe-Armavir» |
0,9 km |
The nearest railway station |
rail road station “Konokovo” |
3 km |
Nearest tracks |
- |
3 km |
Airport |
Airport – city Mineralnie Vody |
165 km |
Seaport |
city Novorossisk |
400 km |
The additional information about ground area |
Special conditions |
The relief of the ground is calm, the soil mostly present by loams and clays, underlaying by pebble ground with sand filling. The level of underground water reveal at the depth of 3,5 m (12.08.2002). Seismicity of ground: 7 points on the Richter scale. |
Cost of rent/repayment of ground area (million rubles) |
31,0/370 |