The ground under construction of swimming pool

Basic information about ground area
The planned use of land The ground under construction of swimming pool
Location of the project Uspenskiy district
Address of the location Krasnodar region, Uspensky district, village Uspenskoe, the southern microdistrict
Cadastral number of quarter 23:34:02 03 002
Area of the declared (ì2) 6 000
Category of the earths Lands of settlement.
Kind of permitted use The zone of construction by low-rice dwelling houses
Actual use Free territory
Availability of buildings, structures, constructions -
Authorizations, urban planning documentation The general plan of construction of the southern microdistrict of village Uspenskoe ( 2002). “Krasnodargrajdanproekt”.
Information about the proprietor (legal owner) of the ground area
Proprietor State property
Legal owner Municipal formation.
Kind of rights State property before delimitation.
Information about burden
Kind of burden, restrictions Absent
Area of burden -
The characteristic of existing engineering infrastructure
Kind of infrastructureCapacity, diameterDistance to a connection point (m)
Electrical supply 10/0,4 kW 70
Gas supply D=89 l.p. 180
Water supply D=100 mm D=100 mm
Water drain D=300 mm 500
Installation of telephones - Connection according to specification of OJSC “UTK”
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) 1,082
Distance till large settlements and objects of transport infrastructure
Remoteness fromThe nameDistance (km)
Center of municipal union v.Uspenskoe 0,5 km
Center of the subject of federation City Krasnodar 269 km
Highways (regional, federal value) Federal road “Caucasus” 6 km
Highways of local value «Uspenskoe-Armavir» 0,9 km
The nearest railway station rail road station “Konokovo” 1 km
Nearest tracks - 1 km
Airport Airport – city Mineralnie Vody 165 km
Seaport 165 km 360 km
The additional information about ground area
Special conditions The relief of the ground is calm, equal with the general bias on the north, according to technical report, executed by Armavir branch of trust \"Sevkavtisiz\" -The soil mostly present by loam brownish and clay with pebble impregnation and sand filler. Underground water reveal at the depth of 2,5 m (12.08.2002). Seismicity of ground: 7 points on the Richter scale.
Cost of rent/repayment of ground area (million rubles) 90,0/600
Notes -