Basic information about ground area |
The planned use of land |
The ground under construction of 40 single-family houses |
Location of the project |
Uspenskiy district |
Address of the location |
Krasnodar region, Uspensky district, village Uspenskoe, the south microdistrict |
Cadastral number of quarter |
23:34:02 03 001: |
Area of the declared (ì2) |
80 000 |
Category of the earths |
Lands of settlement. |
Kind of permitted use |
Residential construction |
Actual use |
Free territory |
Availability of buildings, structures, constructions |
- |
Authorizations, urban planning documentation |
Object location corresponds to the project of building of southern microdistrict of village Uspenskoe under building of housing for the citizens who have suffered from flooding in June 2002ã., it is confirmed by the decision of session of Uspensky district council of deputies from 31.07.2002ã ¹84 |
Information about the proprietor (legal owner) of the ground area |
Proprietor |
State property |
Legal owner |
Municipal formation. |
Kind of rights |
State property before delimitation. |
Information about burden |
Kind of burden, restrictions |
Absent |
Area of burden |
- |
The characteristic of existing engineering infrastructure |
Kind of infrastructure | Capacity, diameter | Distance to a connection point (m) |
Electrical supply |
10/0,4 kWt |
60 |
Gas supply |
D=89 l.p. |
40 |
Water supply |
D=100 mm |
60 |
Water drain |
D=300 mm |
150 |
Installation of telephones |
- |
Connection according to specification of OJSC “UTK” |
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) |
0,332 |
Distance till large settlements and objects of transport infrastructure |
Remoteness from | The name | Distance (km) |
Center of municipal union |
v.Uspenskoe |
0,5 km |
Center of the subject of federation |
City Krasnodar |
269 km |
Highways (regional, federal value) |
Federal road “Caucasus” |
1,5 km |
Highways of local value |
«Uspenskoe-Armavir» |
0,9 km |
The nearest railway station |
rail road station “Konokovo” |
1 km |
Nearest tracks |
- |
1 km |
Airport |
Airport – city Mineralnie Vody |
165 km |
Seaport |
city Novorossisk |
400 km |
The additional information about ground area |
Special conditions |
The relief of the ground is calm, equal with the general bias on the north, according to technical report, executed by Armavir branch of trust \"Sevkavtisiz\" - the level of ground waters for period of researches 15.09.2002 is not established, the soil mostly present by black loam, solid, humous; pale-yellow, macroporous with dorbeetles and roots of flora, pebble ground withj sand filler. Seismicity of ground: 7 points on the Richter scale, a direction of winds east, northeast. |
Cost of rent/repayment of ground area (million rubles) |
50,0/500 |
Notes |
- |