Construction of hotel

Basic information about ground area
The planned use of land Construction of hotel
Location of the project Tihoretskiy district
Address of the location Krasnodar region, Tikhoretsky district, Art. Novorozhdestvenskaya Str. Chapaeva 60 meters to the north - east of the house 313
Cadastral number of quarter 23:32:02 02 013
Area of the declared (ì2) 2000
Category of the earths Earth settlements
Kind of permitted use For the construction and operation of the "Hotel"
Actual use Unassigned
Availability of buildings, structures, constructions no
Authorizations, urban planning documentation Use of this site corresponds to the planning documentation coach of the district.
Information about the proprietor (legal owner) of the ground area
Proprietor State property
Legal owner -
Kind of rights State property
Information about burden
Kind of burden, restrictions encumbrances, there is no limit
Area of burden no
The characteristic of existing engineering infrastructure
Kind of infrastructureCapacity, diameterDistance to a connection point (m)
Electrical supply The point of connection to the grid Kubanenergo PS35/10 "Novorozhdestvenskaya" from TP-P-5-103 120
Gas supply Connection point - medium pressure pipeline D 159 mm, str. Chapaeva installing SHRP regional type 210
Water supply Water well drilling depth of at least 300 meters in the existing water intake ¹ 2 tbsp. Novorozhdestvenskoy, the acquisition of the water tower "Rozhnovska" minimum height of 22 meters -
Water drain Construction of sewage wells (septic tank) -
Installation of telephones from the point of connection (switchboard PID ¹ 1 Mira str.) cabling is TPPepZ 10 * 2 * 0,4 on the existing cable ducts to KKSN ¹ 23 L = 1,8 square meters. From KKSN ¹ 23 cabling is TPPepZ 10h2h0, 4 to telefoniziruemogo premises at a depth of 0.7 meters, L = 1,4 km. 1400
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) 1,74
Distance till large settlements and objects of transport infrastructure
Remoteness fromThe nameDistance (km)
Center of municipal union City Tikhoretsk 24
Center of the subject of federation Krasnodar 156
Highways (regional, federal value) FAD "Caucasus" 29
Highways of local value village Novorozhdestvenskaya 0,01
The nearest railway station Art. Tikhoretskaya 24
Nearest tracks Art. Tikhoretskaya 24
Airport Krasnodar 154
Seaport Yeisk 203
The additional information about ground area
Special conditions Engineering and geological surveys were not carried out: seismicity - 6 points; relief - the calm.
Cost of rent/repayment of ground area (million rubles) Rental price of land: 0,007 million; The cost of land acquisition: 0,02 million;
Notes -