Basic information about ground area |
The planned use of land |
Construction of Gas Stations for 300 fillings per day |
Location of the project |
Tihoretskiy district |
Address of the location |
Krasnodar region, Tikhoretsky district, Art. Ternovskaja, highway "Salsk - Tihoretsk", 64 km + 900 |
Cadastral number of quarter |
23:32:05 03 004 |
Area of the declared (ì2) |
5000 |
Category of the earths |
Earth settlements |
Kind of permitted use |
For the construction and operation of the "gas stations for 300 fillings per day" |
Actual use |
Unassigned |
Availability of buildings, structures, constructions |
no |
Authorizations, urban planning documentation |
Use of this site corresponds to the planning documentation coach of the district. |
Information about the proprietor (legal owner) of the ground area |
Proprietor |
State property |
Legal owner |
- |
Kind of rights |
State property |
Information about burden |
Kind of burden, restrictions |
encumbrances, there is no limit |
Area of burden |
no |
The characteristic of existing engineering infrastructure |
Kind of infrastructure | Capacity, diameter | Distance to a connection point (m) |
Electrical supply |
The point of connection to the grid Kubanenergo 110/10 "Ternovskaja" TP-TR-9-779 |
140 |
Gas supply |
Connecting to the gas network can be realized from the medium pressure gas pipelines D-225 mm to Art. Ternovskaya |
170 |
Water supply |
The source of water is an existing water supply D-100 mm located in the elevator \"Poroshinsky\" |
205 |
Water drain |
Construction of individual sewage |
- |
Installation of telephones |
From the point of connection enclosure SR-1 on the street. Suvorov pave one-pair cable PRPPM 2 * 1.2 at a depth of 0.7 meters to telefoniziruemogo premises. Perform input PRPPM 2 * 1,2 in telefoniziruemoe room running cable protection metalorukavom to a height of 0.8 meters |
150 |
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) |
1,1 |
Distance till large settlements and objects of transport infrastructure |
Remoteness from | The name | Distance (km) |
Center of municipal union |
City Tikhoretsk |
35 |
Center of the subject of federation |
Krasnodar |
217 |
Highways (regional, federal value) |
FAD "Caucasus" |
32 |
Highways of local value |
Ternovskaja village |
0,1 |
The nearest railway station |
Art. Tikhoretskaya |
35 |
Nearest tracks |
Elevator "Poroshinsky" |
0,205 |
Airport |
Krasnodar |
217 |
Seaport |
Yeisk |
231 |
The additional information about ground area |
Special conditions |
Engineering and geological surveys were not carried out: seismicity - 6 points; relief - the calm. |
Cost of rent/repayment of ground area (million rubles) |
Rental price of land: 0,44 million; The cost of land acquisition: 0,46 million; |
Notes |
- |