Shop building

Basic information about ground area
The planned use of land Shop building
Location of the project Timashevskiy district
Address of the location Krasnodar territory, Timashevsky area, Timashevsky, microdistrict. Industrial, Gogol\'s street, 7 A
Cadastral number of quarter 23: 31: 03 07 021
Area of the declared (́2) 96 (m2)
Category of the earths The earths of settlement
Kind of permitted use Zone of an individual housing estate with at the farmstead
Actual use Temporarily are not used
Availability of buildings, structures, constructions Objects of the real estate are absent
Authorizations, urban planning documentation According to the general plan of building of the city of Timashevska developed by the State unitary enterprise «Institute of territorial development of Krasnodar territory» 2005, Council MO confirmed by the decision Timashevsky area of 25.10.2006 ¹269, session ¹30 from 25.10.2006 years
Information about the proprietor (legal owner) of the ground area
Proprietor State ownership
Legal owner Municipal union administration Timashevsky area
Kind of rights The unlocated state ownership which is in conducting Timashevsky City settlement
Information about burden
Kind of burden, restrictions Absent
Area of burden -
The characteristic of existing engineering infrastructure
Kind of infrastructureCapacity, diameterDistance to a connection point (m)
Electrical supply 250 kw 20 m. from an existing electroline on Gogol's street
Gas supply Steel, diameter of 100 mm. 8 m from an existing gas pipeline Low pressure on Gogol's street
Water supply Steel, diameter of 150 mm 7 m - from an existing waterpipe, on Gogol's street
Water drain Pig-iron, diameter of 200 mm 12 metres in an existing sewer network on Gogol's street
Installation of telephones 100 pair 13 m. from an existing line on Gogol's street
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) Water supply: 0,0056 million rbl. The water drain waste âîä:. 0,0096 million rbl. Electrosupply: 0,008́ëí. Rbl. Heat supply: 0,5 million rbl. Gas supply: 0.008́ëí. Rbl. Installation of telephones: 0,0026 million rbl. Total: 0,0338 million rbl.
Distance till large settlements and objects of transport infrastructure
Remoteness fromThe nameDistance (km)
Center of municipal union The city of Timashevsk 7 km
Center of the subject of federation The city of Krasnodar 80 km
Highways (regional, federal value) Krasnodar - Yeysk 2 km
Highways of local value Gogol's street microdistrict Industrial in Timashevsky 0,01 km
The nearest railway station Station Timashevsky 7 km
Nearest tracks City Timashevsk 3 km
Airport The city of Krasnodar 96 km
Seaport Novorossiysk 168 km
The additional information about ground area
Special conditions Seismicity of 7 points, level of subsoil waters 1,7-6́.
Cost of rent/repayment of ground area (million rubles) Cost of rent of the ground area makes 0,0117072 million rbl. a year Cost of the repayment of the ground area will make 0.03062625 million rbl.
Notes Platform ¹ 9