Basic information about ground area |
The planned use of land |
Construction of a kindergarten |
Location of the project |
Slavianskiy district |
Address of the location |
Krasnodar Region, Slavyansky Area, Petrovskaya villadge, block ¹ 252/à, according to the development plan south of the intersection of Poperechnaya and Svetlaya Streets |
Cadastral number of quarter |
23:27:07 04010 |
Area of the declared (ì2) |
2300 |
Category of the earths |
Residential lands |
Kind of permitted use |
For construction of children’s, pre-school and educational institutions. |
Actual use |
Unused |
Availability of buildings, structures, constructions |
The are neither buildings nor structures at the site |
Authorizations, urban planning documentation |
According to the development plan of the Petrovsky Rural settlement developed by OAO Institut Territorialnogo Planirovanya Krasnodarskogo Kraya (The Institute of the Krasnodar Region Territorial Planning) |
Information about the proprietor (legal owner) of the ground area |
Proprietor |
Russia federation |
Legal owner |
Administration of the Slavic area |
Kind of rights |
- |
Information about burden |
Kind of burden, restrictions |
No encumbrances |
Area of burden |
No encumbrances |
The characteristic of existing engineering infrastructure |
Kind of infrastructure | Capacity, diameter | Distance to a connection point (m) |
Electrical supply |
1) Project and construct KTP 10/0, 4 SQ. A type and capacity of transformers - 63 SQ. 2) For a feed projected KTP 10/0,4 kW project and to construct sites ÂË-10 kW from ÂË-10 kW ÏÏ-1; Ï-6; Ï-9 of the program FACILITIES 35/10 kW «Petrovskaya». |
200 m |
Gas supply |
Abow the ground gas pipeline of high pressure till a Grivenskaya street. -70 mm. |
100 m |
Water supply |
1) Points in cutting to street networks of a waterpipe from a Grivenskaya street. 2) On a point of incutting in a waterpipe to establish water well D = 1000 mm from / concrete elements, the fixture and water-meter of calibre = 15 mm. 3) Construction of a waterpipe to execute from polyethylene pipes D = 90 mm. |
100 m |
Water drain |
Dump of sewer drains to provide on projected block-modular ÎÑÊ of a type UBAS |
0 m |
Installation of telephones |
The main line to execute a lining of cable ÒÏÏýï3 100x2x0,4 in the telephone water drain on an automatic telephone exchange-3 site ÐØ-3-04. A distributive line to execute a lining of cable ÒÏÏýï3 of the demanded capacity in the telephone water drain. A point of connection ÐØ-3-04. |
1000 m |
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) |
Water supply: 0,05 Sewage : 0,1 Power supply: 0,04 Gas supply: 0,02 Access roads: 0,048 Telephone supply:0,1 |
Distance till large settlements and objects of transport infrastructure |
Remoteness from | The name | Distance (km) |
Center of municipal union |
Slavyansk-on-Kuban city |
30 km |
Center of the subject of federation |
Krasnodar city |
100 km |
Highways (regional, federal value) |
|
70 km |
Highways of local value |
|
0,025 km |
The nearest railway station |
Slavyansk-on-Kuban city, «Protoka» station |
32 km |
Nearest tracks |
|
32 km |
Airport |
Anapa city |
115 km |
Seaport |
Temryk city |
100 km |
The additional information about ground area |
Special conditions |
The relief of the site is even; the level of subterranean waters is 0.0-0.5 m; background seismcity- 8 points; predominant direction of winds-northeastern. |
Cost of rent/repayment of ground area (million rubles) |
Cost of rent of the ground area 0,003 roub./year , repayment 0,16 mln. roub. |
Notes |
- |