Construction of a prefabricated housing

Basic information about ground area
The planned use of land Construction of a prefabricated housing
Location of the project Slavianskiy district
Address of the location Krasnodar Region, Slavyansky Area, Slavyansk-on-Kuban City, Yugo - Zapadny microdistrict
Cadastral number of quarter 23:27:1306000
Area of the declared (ì2) 200 000
Category of the earths Residential lands
Kind of permitted use Under construction of objects of an inhabited zone
Actual use Unused
Availability of buildings, structures, constructions The are neither buildings nor structures at the site
Authorizations, urban planning documentation According to the development plan of the city of Slavyansk-on-Kuban approved at the 37th session of the Council of the Slavyansky urban settlement ¹4 as of July 23, 2008
Information about the proprietor (legal owner) of the ground area
Proprietor Russia federation
Legal owner Administration of the Slavic area
Kind of rights -
Information about burden
Kind of burden, restrictions No encumbrances
Area of burden No encumbrances
The characteristic of existing engineering infrastructure
Kind of infrastructureCapacity, diameterDistance to a connection point (m)
Electrical supply Connection to the program FACILITIES «Western» 35/10 kW. For electrosupply of all microarea the construction 17 substations is necessary. 1500 m. (up to a considered site is about 3000 m).
Gas supply Connections to ÃÐÑ on distance of 7 km. D = 100
Water supply Connection to networks from a street. Proletarian d = 500, rounding on microarea d = 250, rounding till a streets Proletarskaya from a street Komsomolskaya up to a street. Druzhby Narodov. 4000 m. 2200 m.
Water drain A point of connection to well on crossing of a Lermontov street and street Zaporozhy. For all microarea the construction 7 KNS are necessary. 3000 m.
Installation of telephones The main line to execute a lining of cable ÒÏÏýï3 100x2x0,4 in the telephone water drain on an automatic telephone exchange-3 site ÐØ-3-04. A distributive line to execute a lining of cable ÒÏÏýï3 of the demanded capacity in the telephone water drain. A point of connection ÐØ-3-04. 4000 m
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) Water supply: 19 Sewage : 18,5 Power supply: 27 Gas supply: 17,5 Access roads: 50 Telephone supply:0,4
Distance till large settlements and objects of transport infrastructure
Remoteness fromThe nameDistance (km)
Center of municipal union Slavyansk-on-Kuban city 0 km
Center of the subject of federation Krasnodar city 78 km
Highways (regional, federal value) 5 km
Highways of local value 0,025 km
The nearest railway station Slavyansk-on-Kuban city, «Protoka» station 5 km
Nearest tracks 5 km
Airport Anapa city 87 km
Seaport Temryk city 70 km
The additional information about ground area
Special conditions The relief of the site is even; the level of subterranean waters is 0.0-0.5 m; background seismcity- 8 points; predominant direction of winds-northeastern.
Cost of rent/repayment of ground area (million rubles) Cost of rent of the ground area 0,195 mln. roub./year, repayment 2,5 mln. roub.
Notes -