Basic information about ground area |
The planned use of land |
Building an elite cottage complex |
Location of the project |
Severskiy district |
Address of the location |
Krasnodarskiy region Severskiy district, Stavropolsky settlement, nearest Guseva glaid |
Cadastral number of quarter |
23:26:04 01008:0690 |
Area of the declared (ì2) |
10 000 |
Category of the earths |
The grounds of settlement |
Kind of permitted use |
For inhabited building |
Actual use |
Don’t using |
Availability of buildings, structures, constructions |
No |
Authorizations, urban planning documentation |
Schemes town building planning the territory general plan populated points of Severskiy region is approved by Decision of the Advice MU Severskiy region from March 16 2006 ¹ 252 |
Information about the proprietor (legal owner) of the ground area |
Proprietor |
State property |
Legal owner |
administration of the municipal formation Severskiy region, 69, Lenin st., Severskaya settlement, Severskiy region |
Kind of rights |
Operational manager |
Information about burden |
Kind of burden, restrictions |
Are not registered |
Area of burden |
No |
The characteristic of existing engineering infrastructure |
Kind of infrastructure | Capacity, diameter | Distance to a connection point (m) |
Electrical supply |
power- 400 kVt; |
10 |
Gas supply |
pipeline 215 mm., power- 300 ì3 per hour; 0,25 êÏà |
10 |
Water supply |
Required to build a new artezianian borehole, Power-62.5 ì3 per day, o pipe-line- 300 mm |
|
Water drain |
to build a new local water drain and sewage station -62.5 ì.3per day, o-pipe line 400 |
|
Installation of telephones |
|
400 |
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) |
4.2 |
Distance till large settlements and objects of transport infrastructure |
Remoteness from | The name | Distance (km) |
Center of municipal union |
Severskaya town |
45 |
Center of the subject of federation |
Krasnodar city |
46 |
Highways (regional, federal value) |
Federal auto road Êrasnodar-Novorossiysk |
12 26 |
Highways of local value |
|
0,3 |
The nearest railway station |
“Afipskaya” station |
28 |
Nearest tracks |
|
28 |
Airport |
“Krassnodar” |
54 |
Seaport |
“ Nonorossiysk” |
154 |
The additional information about ground area |
Special conditions |
level of subsoil waters of 1,0-1,5 m, a dominating direction of winds – east, seismistic of 8 points, frozen of ground -0.69m; The site relief flat, is not flooded with freshet waters, mushiness is not present. |
Cost of rent/repayment of ground area (million rubles) |
The sum of the rent -0,07 mln.rbl/ the sum of the ransom – 2,2 mln .rbl. |
Notes |
Number of the population Severskiy region -110,7 thous. person. Population size of Stavropolsky settlement -1 thous. people |