Reconstruction of stadium ”Îlimp”

Basic information about ground area
The planned use of land Reconstruction of stadium ”Îlimp”
Location of the project Severskiy district
Address of the location Krasnodarskiy region, 20 a, Tamanskaya st, Severskiy town of Severskiy district
Cadastral number of quarter 23:26:0104022:0030
Area of the declared (ì2) 25 000
Category of the earths The grounds of settlement
Kind of permitted use For construction many functional sport complex
Actual use sport ground
Availability of buildings, structures, constructions Uncompleted building of a sports complex which are subject to a pulling down, the area of 1080 sq.m.
Authorizations, urban planning documentation Schemes town building planning the territory general plan populated points of Severskiy region is approved by Decision of the Advice MU Severskiy region from March 16 2006 ¹ 252
Information about the proprietor (legal owner) of the ground area
Proprietor State property
Legal owner Administration of Severskysettlement 4, Petrovskogo st., Severskaya settlement, Severskiy region
Kind of rights Operational manager
Information about burden
Kind of burden, restrictions Are not registered
Area of burden No
The characteristic of existing engineering infrastructure
Kind of infrastructureCapacity, diameterDistance to a connection point (m)
Electrical supply To provide complex transformer substation pressure 10/04 kv, capacity to 250 KVa, prospective consumption-100 of Kw in day 10
Gas supply from nearest gas line , o of pipe line 219 sm, meddle power pressure0.25 MPa; approximately consumption-20 cub/m. per day 10
Water supply approximately consumption- 50 cub/m per day, connection point-0.1 km from water supply system on Krasnoarmeyskaya st. Power-4200 ì3 per hour, o pipe-line- 150 mm 10
Water drain In an existing collector, connection point-0.4 km ;power- 2000 ì.3per hour, o-pipe line 400 mm, approximately consumption- 50 cub/m per day 10
Installation of telephones on Krasnoarmeyskaya st. 10
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) 3,0
Distance till large settlements and objects of transport infrastructure
Remoteness fromThe nameDistance (km)
Center of municipal union Severskaya town 0
Center of the subject of federation Krasnodar city 37
Highways (regional, federal value) Federal auto road Êrasnodar-Novorossiysk 0,9
Highways of local value 0,025
The nearest railway station “Severskaya” station 4
Nearest tracks 4
Airport “Krassnodar” 48
Seaport “Nonorossiysk” 109
The additional information about ground area
Special conditions level of subsoil waters of 1,0-1,5 m, a dominating direction of winds – east, seismistic of 8 points, frozen of ground -0.69m; The site relief flat, is not flooded with freshet waters, mushiness is not present.
Cost of rent/repayment of ground area (million rubles) The sum of the rent -0,1mln.rbl/ the sum of the ransom –3.5 mln .rbl.
Notes Number of the population Severskiy region -110,7 thous. person. Population size of Severskaya settlement are 24 thous. people