Basic information about ground area |
The planned use of land |
Building a mega farm |
Location of the project |
Severskiy district |
Address of the location |
Krasnodarskiy region Severskiy district, Novodmitrievskaya settlement |
Cadastral number of quarter |
23:26:08 01 000:429 |
Area of the declared (ì2) |
100 000 |
Category of the earths |
The grounds of agricultural purpose |
Kind of permitted use |
For building and using farm |
Actual use |
Don’t using |
Availability of buildings, structures, constructions |
No |
Authorizations, urban planning documentation |
Schemes town building planning the territory general plan populated points of Severskiy region is approved by Decision of the Advice MU Severskiy region from March 16 2006 ¹ 252 |
Information about the proprietor (legal owner) of the ground area |
Proprietor |
State property |
Legal owner |
administration of the municipal formation Severskiy region, 69, Lenin st., Severskaya settlement, Severskiy region |
Kind of rights |
Operational manager |
Information about burden |
Kind of burden, restrictions |
Are not registered |
Area of burden |
No |
The characteristic of existing engineering infrastructure |
Kind of infrastructure | Capacity, diameter | Distance to a connection point (m) |
Electrical supply |
from existing installation 35\\10 kW «Mikhaylovskaya» – 2245,2 kWt |
30 |
Gas supply |
from nearest gas line , o of pipe line 220 mm, meddle power pressure 0,25 êÏà |
60 |
Water supply |
Power-300 ì3 per day, o pipe-line- 219 mm |
70 |
Water drain |
Power-200 ì3 per day, o pipe-line- 400 mm |
To build a water drain of sewage station |
Installation of telephones |
|
500 |
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) |
3.8 |
Distance till large settlements and objects of transport infrastructure |
Remoteness from | The name | Distance (km) |
Center of municipal union |
Severskaya town |
28 |
Center of the subject of federation |
Krasnodar city |
65 ore 32 |
Highways (regional, federal value) |
Federal auto road Êrasnodar-Novorossiysk |
28 |
Highways of local value |
|
0,1 |
The nearest railway station |
“Severskaya” station |
29,5 |
Nearest tracks |
|
28 |
Airport |
“Krassnodar” |
70 |
Seaport |
“Nonorossiysk” |
137 |
The additional information about ground area |
Special conditions |
level of subsoil waters of 1,0-1,5 m, a dominating direction of winds – east, seismistic of 8 points, frozen of ground -0.69m; The site relief flat, is not flooded with freshet waters, mushiness is not present. |
Cost of rent/repayment of ground area (million rubles) |
The sum of the rent -0,2 mln.rbl/ the sum of the ransom –12 mln .rbl. |
Notes |
Number of the population Severskiy region -110,7 thous. person. Population size of Mikhaylovskaya settlement -2.1 thous. people |