Basic information about ground area |
The planned use of land |
Building a stood farm |
Location of the project |
Severskiy district |
Address of the location |
Krasnodarskiy region Severskiy district, Novodmitrievskaya settlement |
Cadastral number of quarter |
23:26:0901 000:401 |
Area of the declared (ì2) |
70 000 |
Category of the earths |
The grounds of agricultural purpose |
Kind of permitted use |
For building and using farm |
Actual use |
Don’t using |
Availability of buildings, structures, constructions |
No |
Authorizations, urban planning documentation |
Schemes town building planning the territory general plan populated points of Severskiy region is approved by Decision of the Advice MU Severskiy region from March 16 2006 ¹ 252 |
Information about the proprietor (legal owner) of the ground area |
Proprietor |
State property |
Legal owner |
administration of the municipal formation Severskiy region, 69, Lenin st., Severskaya settlement, Severskiy region |
Kind of rights |
Operational manager |
Information about burden |
Kind of burden, restrictions |
Are not registered |
Area of burden |
No |
The characteristic of existing engineering infrastructure |
Kind of infrastructure | Capacity, diameter | Distance to a connection point (m) |
Electrical supply |
from installation PS 35\\6 kw «Novodmitrievskaya» power 2245,2 kWt |
50 |
Gas supply |
from nearest gas line , o of pipe line 220 mm, meddle power pressure 0,25 êÏà |
20 |
Water supply |
Power-100 ì3 per day, o pipe-line- 219 mm |
Required a new artezianian borehole |
Water drain |
|
To build a water drain of sewage station ore septic |
Installation of telephones |
|
250 |
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) |
2.9 |
Distance till large settlements and objects of transport infrastructure |
Remoteness from | The name | Distance (km) |
Center of municipal union |
Severskaya town |
23 |
Center of the subject of federation |
Krasnodar city |
14 |
Highways (regional, federal value) |
Federal auto road Êrasnodar-Novorossiysk |
2,5 |
Highways of local value |
|
0,05 |
The nearest railway station |
“Afipskaya” station |
9 |
Nearest tracks |
|
5 |
Airport |
“Krassnodar” |
22 |
Seaport |
“Nonorossiysk” |
132 |
The additional information about ground area |
Special conditions |
level of subsoil waters of 1,0-1,5 m, a dominating direction of winds – east, seismistic of 8 points, frozen of ground -0.69m; The site relief flat, is not flooded with freshet waters, mushiness is not present. |
Cost of rent/repayment of ground area (million rubles) |
The sum of the rent -0,16 mln.rbl/ the sum of the ransom –12 mln .rbl. |
Notes |
Number of the population Severskiy region -110,7 thous. person. Population size of Novodmitriyevskiy settlement -5.4 thous. people |