Basic information about ground area |
The planned use of land |
Biological waste products processing plant |
Location of the project |
Pavlovskiy district |
Address of the location |
Southwestern part of village Pavlovskaya, near the treatment plant sugar factory |
Area of the declared (ě2) |
87 000 (m2) |
Category of the earths |
Agricultural land |
The characteristic of existing engineering infrastructure |
Kind of infrastructure | Capacity, diameter | Distance to a connection point (m) |
Electrical supply |
Electric line 35 kV at a distance. We must build-ship power substations 35/10 kV or 110/10 kV |
800 |
Gas supply |
high pressure gas pipeline D 219 mm, P = 6 bar |
2000 |
Water supply |
Artesian well |
2450 |
Water drain |
Existing treatment facilities |
370 |
Distance till large settlements and objects of transport infrastructure |
Remoteness from | The name | Distance (km) |
Center of municipal union |
The Pavlovskaya |
- |
Center of the subject of federation |
Krasnodar city |
120 |
Highways (regional, federal value) |
federal roads "Don" Boundary roads "Old-Minsk - Leningrad - Pavlovsk |
6,25 0,050 |
Highways of local value |
- |
0,050 |
The nearest railway station |
Railway station«Sosyka –Rostov» |
6,11 |
Nearest tracks |
- |
0,030 |
Airport |
The Krasnodar |
126 |
Seaport |
The Eisk |
162 |