Basic information about ground area |
The planned use of land |
Placement the enterprise for producing the coloured pavement tile |
Location of the project |
Otradnenskiy district |
Address of the location |
Krasnodar region Otradnenskiy district Otradnaya, 170 meters north east of Otradnaya branch of Armavir college -11 |
Cadastral number of quarter |
no |
Area of the declared (ì2) |
30000 |
Category of the earths |
Settlement ground |
Kind of permitted use |
Agricultural use |
Actual use |
Residents fields |
Availability of buildings, structures, constructions |
no |
Authorizations, urban planning documentation |
« The general plan of village Otradnaya », the forty eighth session of the first convocation of Council of Otradnaya rural settlement of Otradnaya district approved by the decision from January, 29th, 2009 ¹278 |
Information about the proprietor (legal owner) of the ground area |
Proprietor |
State property |
Legal owner |
under jurisdiction of Otradnaya settlement authority (Administration of Otradnaya of settlement of municipal formation Otradnensky district, Krasnodar territory, Otradnensky district, village Otradnaya, street Pervomayskaya, 8) |
Kind of rights |
State property |
Information about burden |
Kind of burden, restrictions |
No information |
Area of burden |
No information |
The characteristic of existing engineering infrastructure |
Kind of infrastructure | Capacity, diameter | Distance to a connection point (m) |
Electrical supply |
ÊÒP -100 kW /À, VL-10 kW |
0 (necessary construction of power station) |
Gas supply |
High Pressure Pipe (more 6 MPa), D=200mm |
210 (Under condition of modification the scheme of gas supply of Otradnaya) |
Water supply |
Vtank=25,0 m3 |
Independent water supply (pool tank) in view water consumption for technical needs |
Water drain |
Vseptic = 3,6 m3, Dpipe = 100-150 mm |
5-6 meters from building |
Installation of telephones |
ÒÏÏ çï3Á 10õ2õ0,4 |
100 |
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) |
1,6 |
Distance till large settlements and objects of transport infrastructure |
Remoteness from | The name | Distance (km) |
Center of municipal union |
village Otradnaya |
0 |
Center of the subject of federation |
city Krasnodar |
300 |
Highways (regional, federal value) |
Rostov-on-Don - Makhachkala |
80 |
Highways of local value |
Otradnaya– Udobnaya |
0,1 |
The nearest railway station |
town Armavir |
80 |
Nearest tracks |
town Armavir |
80 |
Airport |
town Armavir |
80 |
Seaport |
town Novorossiysk |
420 |
The additional information about ground area |
Special conditions |
Seismicity 7 points |
Cost of rent/repayment of ground area (million rubles) |
Annual cost of rent – 0,18 mln.rub. |
Notes |
no |