Basic information about ground area |
The planned use of land |
Placement of the enterprise on manufacture of tinned production on the basis of resources of a local agricultural production (vegetable growing, plant growing, animal industries) |
Location of the project |
Otradnenskiy district |
Address of the location |
Krasnodar region Otradnensky district , Otradnaya, 310 meters to the north of Otradnaya branch of Armavir college ÏÓ-11 |
Cadastral number of quarter |
no |
Area of the declared (ì2) |
30000 |
Category of the earths |
Settlement ground |
Kind of permitted use |
Agricultural use |
Actual use |
Fields of residents |
Availability of buildings, structures, constructions |
no |
Authorizations, urban planning documentation |
« The general plan of village Otradnaya », the forty eighth session of the first convocation of Council of Otradnaya rural settlement of Otradnaya district approved by the decision from January, 29th, 2009 ¹278 |
Information about the proprietor (legal owner) of the ground area |
Proprietor |
State property |
Legal owner |
under jurisdiction of Otradnaya settlement authority (Administration of Otradnaya of settlement of municipal formation Otradnensky district, Krasnodar territory, Otradnensky district, village Otradnaya, street Pervomayskaya, 8) |
Kind of rights |
State property |
Information about burden |
Kind of burden, restrictions |
No information |
Area of burden |
No information |
The characteristic of existing engineering infrastructure |
Kind of infrastructure | Capacity, diameter | Distance to a connection point (m) |
Electrical supply |
ÊÒP – 100 kW /À, Line-10 kW, VL-35 kW |
20 |
Gas supply |
High pressure gas line more 6 MPa |
10 (Under condition of modification in the general scheme of gas supply of village Otradnaya and constructions SHRP) |
Water supply |
V pool=100,0 ì3 |
Independent water supply (pool) |
Water drain |
Vseptic = 100 ì3 (or sewage systems«Topas»), Dpipe = 100-150 mm |
Not less 5-6 meters from building (within land plot) |
Installation of telephones |
ÒÏÏ çï3Á 10õ2õ0,4 |
200 |
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) |
2,250 |
Distance till large settlements and objects of transport infrastructure |
Remoteness from | The name | Distance (km) |
Center of municipal union |
village Otradnaya |
0 |
Center of the subject of federation |
city Krasnodar |
300 |
Highways (regional, federal value) |
Rostov-on-Don - Makhachkala |
80 |
Highways of local value |
Otradnaya– Udobnaya |
0,2 |
The nearest railway station |
town Armavir |
80 |
Nearest tracks |
town Armavir |
80 |
Airport |
town Armavir |
80 |
Seaport |
town Novorossiysk |
420 |
The additional information about ground area |
Special conditions |
Seismicity of 7 points |
Cost of rent/repayment of ground area (million rubles) |
Annual cost of rent – 0,18 million roubles |
Notes |
no |