Placement of the enterprise on manufacture of tinned production on the basis of resources of a local agricultural production (vegetable growing, plant growing, animal industries)

Basic information about ground area
The planned use of land Placement of the enterprise on manufacture of tinned production on the basis of resources of a local agricultural production (vegetable growing, plant growing, animal industries)
Location of the project Otradnenskiy district
Address of the location Krasnodar region Otradnensky district , Otradnaya, 310 meters to the north of Otradnaya branch of Armavir college ÏÓ-11
Cadastral number of quarter no
Area of the declared (ì2) 30000
Category of the earths Settlement ground
Kind of permitted use Agricultural use
Actual use Fields of residents
Availability of buildings, structures, constructions no
Authorizations, urban planning documentation « The general plan of village Otradnaya », the forty eighth session of the first convocation of Council of Otradnaya rural settlement of Otradnaya district approved by the decision from January, 29th, 2009 ¹278
Information about the proprietor (legal owner) of the ground area
Proprietor State property
Legal owner under jurisdiction of Otradnaya settlement authority (Administration of Otradnaya of settlement of municipal formation Otradnensky district, Krasnodar territory, Otradnensky district, village Otradnaya, street Pervomayskaya, 8)
Kind of rights State property
Information about burden
Kind of burden, restrictions No information
Area of burden No information
The characteristic of existing engineering infrastructure
Kind of infrastructureCapacity, diameterDistance to a connection point (m)
Electrical supply ÊÒP – 100 kW /À, Line-10 kW, VL-35 kW 20
Gas supply High pressure gas line more 6 MPa 10 (Under condition of modification in the general scheme of gas supply of village Otradnaya and constructions SHRP)
Water supply V pool=100,0 ì3 Independent water supply (pool)
Water drain Vseptic = 100 ì3 (or sewage systems«Topas»), Dpipe = 100-150 mm Not less 5-6 meters from building (within land plot)
Installation of telephones ÒÏÏ çï3Á 10õ2õ0,4 200
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) 2,250
Distance till large settlements and objects of transport infrastructure
Remoteness fromThe nameDistance (km)
Center of municipal union village Otradnaya 0
Center of the subject of federation city Krasnodar 300
Highways (regional, federal value) Rostov-on-Don - Makhachkala 80
Highways of local value Otradnaya– Udobnaya 0,2
The nearest railway station town Armavir 80
Nearest tracks town Armavir 80
Airport town Armavir 80
Seaport town Novorossiysk 420
The additional information about ground area
Special conditions Seismicity of 7 points
Cost of rent/repayment of ground area (million rubles) Annual cost of rent – 0,18 million roubles
Notes no