Place for parking deployment

Basic information about ground area
The planned use of land Place for parking deployment
Location of the project Novorossiysk city
Address of the location Novorossiysk, Vasenko st., near block of flats №87
Cadastral number of quarter 23:47:0201054
Area of the declared (м2) 750 sq.m.
Category of the earths Земли поселений в черте г.Новороссийска
Kind of permitted use G-1- low floors buildings, mostly farmstead type buildings
Actual use Not build up territory
Availability of buildings, structures, constructions No structures and buildings on land site
Authorizations, urban planning documentation Rules of land use and building of municipal entity town-hero Novorossiysk, confirmed by Decision of the municipal duma from 22.04.2008 №562 and come in right in 27.05.2008
Information about the proprietor (legal owner) of the ground area
Proprietor Under authority of municipal entity town Novorossiysk
Legal owner Administration of municipal entity town Novorossiysk
Kind of rights Municipal property
Information about burden
Kind of burden, restrictions None
Area of burden None
The characteristic of existing engineering infrastructure
Kind of infrastructureCapacity, diameterDistance to a connection point (m)
Electrical supply 0,4 kWt 50
Water supply D-100 mm 150
Water drain Special cleaning
Installation of telephones 200
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) 0,5
Distance till large settlements and objects of transport infrastructure
Remoteness fromThe nameDistance (km)
Center of municipal union Novorossiysk 6
Center of the subject of federation Krasnodar 150
Highways (regional, federal value) Don 7
Highways of local value 0
The nearest railway station Rail station Novorossiysk 3
Nearest tracks Rail station Novorossiysk 3
Airport Anapa 50
Seaport Novorossiysk 5
The additional information about ground area
Special conditions Background seismicity of territory of the Novorossiysk, according to Rules and norms codex №11-7-81, decision of Construction Ministry of RF №18-76 from 26.07.95 – 8.0 grades. Seismicity of construction land site accept equal to 8 grades.
Cost of rent/repayment of ground area (million rubles) 0,370