Construction of the production base

Basic information about ground area
The planned use of land Construction of the production base
Location of the project Novorossiysk city
Address of the location Novorossiysk city, Pogranichnaya street, 67-73
Cadastral number of quarter 23:47:0207001
Area of the declared (ì2) 1915 ì2
Category of the earths Lands of the settlements within the area of the Novorossiysk city
Kind of permitted use Ñ-4 – zone of the unused natural territories
Actual use Territory free of any housing
Availability of buildings, structures, constructions The lot is free from any type of construction
Authorizations, urban planning documentation Rules of the land tenure and construction of the municipal entity of the Novorossiysk city, approved by the decision ¹562 of the town’s Duma on the 22nd of April 2008. Came into force on the 27th of May 2008.
Information about the proprietor (legal owner) of the ground area
Proprietor Administration of the Novorossiysk city
Legal owner Administration of Novorossiysk city
Kind of rights Municipal property
Information about burden
Kind of burden, restrictions Secured zone of the engineering communications – water pipeline
Area of burden 80 ì2
The characteristic of existing engineering infrastructure
Kind of infrastructureCapacity, diameterDistance to a connection point (m)
Electrical supply 0,4 cubic watt 10-20
Gas supply 100 ìì 280
Water supply 100 ìì 200-300
Water drain Special raking system
Installation of telephones 100-200
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) 2,4
Distance till large settlements and objects of transport infrastructure
Remoteness fromThe nameDistance (km)
Center of municipal union Novorossiysk city 5
Center of the subject of federation Krasnodar city 160
Highways (regional, federal value) Don 3
Highways of local value 0
The nearest railway station Novorossiysk city 2
Nearest tracks Novorossiysk city 2
Airport Anapa city 50
Seaport Novorossiysk city 3
The additional information about ground area
Special conditions 8 grades seismicity
Cost of rent/repayment of ground area (million rubles) 1,33
Notes Investment project is to be realized for the purposes not to be conflict with town-planning regulations established for the present territory