Low-rise housing construction

Basic information about ground area
The planned use of land Low-rise housing construction
Location of the project Novorossiysk city
Address of the location Novorossiysk city
Cadastral number of quarter 23:47:0106002
Area of the declared (ì2) 6207 ì2
Category of the earths Lands of the settlements within the area of the township Verhnebakanskiy
Kind of permitted use 04 – multifunctional construction Ñ6 – special purposes territories, green plantations projected
Actual use Territory free of any housing
Availability of buildings, structures, constructions The lot is free from any type of construction
Authorizations, urban planning documentation General plan of the Novorossiysk city, developed by the institute “Giprogor” in Moscow in 2002, approved by the decision ¹97 of the 4th convocational Duma on the 8th of September 2005
Information about the proprietor (legal owner) of the ground area
Proprietor Administration of the Novorossiysk city
Legal owner Administration of Novorossiysk city
Kind of rights Municipal property
Information about burden
Kind of burden, restrictions Engineering communications: gas pipeline
Area of burden 60 ì2
The characteristic of existing engineering infrastructure
Kind of infrastructureCapacity, diameterDistance to a connection point (m)
Electrical supply 0,4 cubic watt 200-300
Gas supply 100 ìì 270
Water supply 300 ìì 1000-1500
Water drain 400 ìì 1000
Installation of telephones 200-300
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) 9,5
Distance till large settlements and objects of transport infrastructure
Remoteness fromThe nameDistance (km)
Center of municipal union Novorossiysk city 27
Center of the subject of federation Krasnodar city 150
Highways (regional, federal value) Novorossiysk city - Kerch’s strait 1
Highways of local value 0
The nearest railway station station Verhnebakanskaya 20
Nearest tracks station Verhnebakanskaya 20
Airport Anapa city 30
Seaport Novorossiysk city 27
The additional information about ground area
Special conditions 8 grades seismicity
Cost of rent/repayment of ground area (million rubles) 2,05
Notes Investment project is to be realized for the purposes not to be conflict with town-planning regulations established for the present territory