Basic information about ground area |
The planned use of land |
Installation of the low-rise housing construction |
Location of the project |
Novorossiysk city |
Address of the location |
Novorossiysk city, stanitsa Rayevskaya, area of the detour road |
Cadastral number of quarter |
23:47:0103001 |
Area of the declared (ì2) |
909091 ì2 |
Category of the earths |
Lands for the agricultural purposes |
Kind of permitted use |
Zone of the unplanted territories |
Actual use |
Territory free of any housing |
Availability of buildings, structures, constructions |
The lot is free from any type of construction |
Authorizations, urban planning documentation |
General plan of the Novorossiysk city, developed by the institute “Giprogor” in Moscow in 2002, approved by the decision ¹97 of the 4th convocational Duma on the 8th of September 2005 |
Information about the proprietor (legal owner) of the ground area |
Proprietor |
Administration of the Novorossiysk city |
Legal owner |
Administration of Novorossiysk city |
Kind of rights |
Municipal property |
Information about burden |
Kind of burden, restrictions |
None |
Area of burden |
None |
The characteristic of existing engineering infrastructure |
Kind of infrastructure | Capacity, diameter | Distance to a connection point (m) |
Electrical supply |
0,4 cubic watt |
10-20 |
Gas supply |
100 ìì |
50-70 |
Water supply |
100 ìì |
200-300 |
Water drain |
200 ìì |
300-500 |
Installation of telephones |
|
100-200 |
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) |
6,1 |
Distance till large settlements and objects of transport infrastructure |
Remoteness from | The name | Distance (km) |
Center of municipal union |
Novorossiysk city |
27 |
Center of the subject of federation |
Krasnodar city |
150 |
Highways (regional, federal value) |
Novorossiysk city - Kerch’s strait |
1 |
Highways of local value |
|
0 |
The nearest railway station |
station Verhnebakanskaya |
20 |
Nearest tracks |
station Verhnebakanskaya |
20 |
Airport |
Anapa city |
30 |
Seaport |
Novorossiysk city |
27 |
The additional information about ground area |
Special conditions |
8 grades seismicity |
Cost of rent/repayment of ground area (million rubles) |
90 |
Notes |
Investment project is to be realized for the purposes not to be conflict with town-planning regulations established for the present territory |