Low-rise housing construction

Basic information about ground area
The planned use of land Low-rise housing construction
Location of the project Novorossiysk city
Address of the location Novorossiysk city, stanitsa Rayevskaya, area of the Novorossiyskaya street
Cadastral number of quarter 23:47:0102006
Area of the declared (́2) 7598 ́2
Category of the earths Lands of the settlements within the area of the stanitsa Rayevskaya
Kind of permitted use Zone of the mixed and low-rise site development (existing)
Actual use Territory free of any housing
Availability of buildings, structures, constructions The lot is free from any type of construction
Authorizations, urban planning documentation General plan of the Novorossiysk city, developed by the institute “Giprogor” in Moscow in 2002, approved by the decision ¹97 of the 4th convocational Duma on the 8th of September 2005
Information about the proprietor (legal owner) of the ground area
Proprietor Administration of the Novorossiysk city
Legal owner Administration of Novorossiysk city
Kind of rights Municipal property
Information about burden
Kind of burden, restrictions Must be defined during the projection
Area of burden Must be defined during the projection
The characteristic of existing engineering infrastructure
Kind of infrastructureCapacity, diameterDistance to a connection point (m)
Electrical supply 0,4 cubic watt 20-30
Gas supply 100 ́́ 130
Water supply 100 ́́ 20-50
Water drain 150 ́́ 20-50
Installation of telephones 50
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) 1,0
Distance till large settlements and objects of transport infrastructure
Remoteness fromThe nameDistance (km)
Center of municipal union Novorossiysk city 6
Center of the subject of federation Krasnodar city 150
Highways (regional, federal value) Don 7
Highways of local value 0
The nearest railway station Novorossiysk city 3
Nearest tracks Novorossiysk city 3
Airport Anapa city 50
Seaport Novorossiysk city 5
The additional information about ground area
Special conditions 8 grades seismicity
Cost of rent/repayment of ground area (million rubles) 1,5
Notes Investment project is to be realized for the purposes not to be conflict with town-planning regulations established for the present territory