Installation of the low-rise housing construction

Basic information about ground area
The planned use of land Installation of the low-rise housing construction
Location of the project Novorossiysk city
Address of the location Novorossiysk city, stanitsa Rayevskaya, area of the Mira street
Cadastral number of quarter 23:47:0102077:52
Area of the declared (ì2) 2326 ì2
Category of the earths Lands of the settlements within the area of the stanitsa Rayevskaya
Kind of permitted use Zone of the mixed and low-rise site development
Actual use Territory free of any housing
Availability of buildings, structures, constructions The lot is free from any type of construction
Authorizations, urban planning documentation General plan of the Novorossiysk city, developed by the institute “Giprogor” in Moscow in 2002, approved by the decision ¹97 of the 4th convocational Duma on the 8th of September 2005
Information about the proprietor (legal owner) of the ground area
Proprietor Administration of the Novorossiysk city
Legal owner Administration of Novorossiysk city
Kind of rights Municipal property
Information about burden
Kind of burden, restrictions None
Area of burden None
The characteristic of existing engineering infrastructure
Kind of infrastructureCapacity, diameterDistance to a connection point (m)
Electrical supply 0,4 cubic watt 15
Gas supply 100 ìì 100
Water supply 100 ìì 800-1000
Water drain 400 ìì 500-800
Installation of telephones 60
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) 63,8
Distance till large settlements and objects of transport infrastructure
Remoteness fromThe nameDistance (km)
Center of municipal union Novorossiysk city 27
Center of the subject of federation Krasnodar city 150
Highways (regional, federal value) Novorossiysk city - Kerch’s strait 1
Highways of local value 0
The nearest railway station station Verhnebakanskaya 20
Nearest tracks station Verhnebakanskaya 20
Airport Anapa city 30
Seaport Novorossiysk city 27
The additional information about ground area
Special conditions 8 grades seismicity
Cost of rent/repayment of ground area (million rubles) 0,86
Notes Investment project is to be realized for the purposes not to be conflict with town-planning regulations established for the present territory