For construction of low housing buildings

Basic information about ground area
The planned use of land For construction of low housing buildings
Location of the project Novorossiysk city
Address of the location Novorossiysk, Natukhaevskaya set/
Cadastral number of quarter 23:47:0101001:421
Area of the declared (ì2) 204128 sq.m.
Category of the earths lands of settlements within the area of Natukhaevskaya set.
Kind of permitted use Living housing construction buildings on mastered territories. Regulations and types of usage will be developed till 2011 in appendix to Rules of land usage and land-construction of municipal entity Novorossiysk, confirmed by decision of town Duma f
Actual use Not build up territory
Availability of buildings, structures, constructions No structures and buildings on land site
Authorizations, urban planning documentation General plan of Novorossiysk, developed by “Giprogor” institute Moscow in 2002, and approved by decision ¹97 from 08.09.2005 of town duma 4th convocation.
Information about the proprietor (legal owner) of the ground area
Proprietor Under authority of municipal entity town Novorossiysk
Legal owner Administration of municipal entity town Novorossiysk
Kind of rights Municipal property
Information about burden
Kind of burden, restrictions None
Area of burden None
The characteristic of existing engineering infrastructure
Kind of infrastructureCapacity, diameterDistance to a connection point (m)
Electrical supply 0,4 kWt 10-20
Gas supply D-100 mm 180
Water supply D-100 mm 10-20
Water drain Special cleaning
Installation of telephones 100-200
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) 1,5
Distance till large settlements and objects of transport infrastructure
Remoteness fromThe nameDistance (km)
Center of municipal union Novorossiysk 27
Center of the subject of federation Krasnodar 150
Highways (regional, federal value) Novorossiysk - Kerch passage 1
Highways of local value 0
The nearest railway station Rail station Verhnebakanskaya 20
Nearest tracks Rail station Verhnebakanskaya 20
Airport Anapa 30
Seaport Novorossiysk 27
The additional information about ground area
Special conditions Background seismicity of territory of the Novorossiysk, according to Rules and norms codex ¹11-7-81, decision of Construction Ministry of RF ¹18-76 from 26.07.95 – 8.0 grades. Seismicity of construction land site accept equal to 8 grades.
Cost of rent/repayment of ground area (million rubles) 26
Notes Investment project is to be realized for the purposes not to be in conflict with town-planning regulations established for the present territory