Basic information about ground area |
The planned use of land |
Construction of nonliving object (warehouse) |
Location of the project |
Novorossiysk city |
Address of the location |
Novorossiysk, Primorskiy inner city district, production zone «Kirilovskaya» |
Cadastral number of quarter |
23:47:0109008:182 |
Area of the declared (ì2) |
2650 sq.m. |
Category of the earths |
lands of settlements within the area of Novorossiysk city |
Kind of permitted use |
PK-3- production-municipal zone 3rd type |
Actual use |
Not build up territory |
Availability of buildings, structures, constructions |
No structures and buildings on land site |
Authorizations, urban planning documentation |
Rules of land use and building of municipal entity town-hero Novorossiysk, confirmed by Decision of the municipal duma from 22.04.2008 ¹562 and come in right in 27.05.2008 |
Information about the proprietor (legal owner) of the ground area |
Proprietor |
Under authority of municipal entity town Novorossiysk |
Legal owner |
Administration of municipal entity town Novorossiysk |
Kind of rights |
Municipal property |
Information about burden |
Kind of burden, restrictions |
20 meters near Air Electro line. |
Area of burden |
Not located |
The characteristic of existing engineering infrastructure |
Kind of infrastructure | Capacity, diameter | Distance to a connection point (m) |
Electrical supply |
0,4 kWt |
20-30 |
Gas supply |
D-100 mm |
200-250 |
Water supply |
|
Chink |
Water drain |
|
Special cleaning |
Installation of telephones |
|
200-300 |
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) |
0,5 |
Distance till large settlements and objects of transport infrastructure |
Remoteness from | The name | Distance (km) |
Center of municipal union |
Novorossiysk |
9 |
Center of the subject of federation |
Krasnodar |
160 |
Highways (regional, federal value) |
Novorossiysk - Kerch passage |
10 |
Highways of local value |
|
0 |
The nearest railway station |
Rail station Verhnebakanskaya |
12 |
Nearest tracks |
Rail station Verhnebakanskaya |
12 |
Airport |
Anapa |
60 |
Seaport |
Novorossiysk |
10 |
The additional information about ground area |
Special conditions |
Background seismicity of territory of the Novorossiysk, according to Rules and norms codex ¹11-7-81, decision of Construction Ministry of RF ¹18-76 from 26.07.95 – 8.0 grades. Seismicity of construction land site accept equal to 8 grades. |
Cost of rent/repayment of ground area (million rubles) |
0,85 |
Notes |
Investment project is to be realized for the purposes not to be in conflict with town-planning regulations established for the present territory |