Basic information about ground area |
The planned use of land |
Construction of industrial facilities |
Location of the project |
Novokubanskiy district |
Address of the location |
Krasnodar territory, Novokubansky area, Novokubansk, along the road “Otrado-Olginskoye-Novokubansk-Armavir” |
Area of the declared (ě2) |
8 000 |
Category of the earths |
Land of localities |
The characteristic of existing engineering infrastructure |
Kind of infrastructure | Capacity, diameter | Distance to a connection point (m) |
Electrical supply |
Overhead transmission line 10 kV, substation 35/10 |
50 m Urozhainaya street |
Gas supply |
D-150 mm |
100 m Urozhainaya street |
Water supply |
D-100 mm |
100 m Urozhainaya street |
Water drain |
D-600 mm |
100 m Urozhainaya street |
Distance till large settlements and objects of transport infrastructure |
Remoteness from | The name | Distance (km) |
Center of municipal union |
Novokubansk |
|
Center of the subject of federation |
Krasnodar |
200 |
Highways (regional, federal value) |
“Otrado-Olginskoye-Novokubansk-Armavir” |
0,2 |
Highways of local value |
Paromnaya street |
0,38 |
The nearest railway station |
Kubanskaya station |
4,0 |
Nearest tracks |
Rostov-Baku |
4,0 |
Airport |
Krasnodar |
200 |