Basic information about ground area |
The planned use of land |
Construction of industrial facilities (Wood processing workshop, workshop producing furniture, etc.) |
Location of the project |
Novokubanskiy district |
Address of the location |
Krasnodar region, Novokubansky area, Novokubansk, Paromnaya street |
Area of the declared (ě2) |
5 000 |
Category of the earths |
Land of localities |
The characteristic of existing engineering infrastructure |
Kind of infrastructure | Capacity, diameter | Distance to a connection point (m) |
Electrical supply |
0,4 / 10 kV substation 35/10 kV Novokubanskaya |
200 m Paromnaya street |
Gas supply |
D-100 mm |
220 m Paromnaya street |
Water supply |
D-200 mm |
215 m Paromnaya street |
Water drain |
D-200 mm |
200 m Paromnaya street |
Distance till large settlements and objects of transport infrastructure |
Remoteness from | The name | Distance (km) |
Center of municipal union |
Novokubansk |
|
Center of the subject of federation |
Krasnodar |
200 |
Highways (regional, federal value) |
Federal road “Kavkaz” M-29 |
10 |
Highways of local value |
Paromnaya street |
|
The nearest railway station |
Kubanskaya station |
5 |
Nearest tracks |
Rostov-Baku |
5 |