Construction of a trading complex

Basic information about ground area
The planned use of land Construction of a trading complex
Location of the project Mostovskoy district
Address of the location Item Mostovskoy, street Perepravnenskaja (microdistrict Air field)
Cadastral number of quarter 23:20:0107010
Area of the declared (ì2) 4225
Category of the earths The Earth of settlements
Kind of permitted use Resolved use of the ground area: shops and shopping centers. A territorial zone — a socially-business zone of local value (roadside service).
Actual use It is not used
Availability of buildings, structures, constructions No
Authorizations, urban planning documentation The general plan Mostovskoy of city settlement developed by Open Company « Project institute of territorial planning », the decision of advice Mostovskogo of city settlement from 12/2/2009 of year 438
Information about the proprietor (legal owner) of the ground area
Proprietor State ownership
Legal owner State ownership
Kind of rights -
Information about burden
Kind of burden, restrictions No
Area of burden No
The characteristic of existing engineering infrastructure
Kind of infrastructureCapacity, diameterDistance to a connection point (m)
Electrical supply LEP – 10 kw 37
Gas supply d=57-76 mm; 500
Water supply Existing waterpipe – steel d=100 mm; 60
Water drain Existing sewage -and/µ d=150 mm; 60
Installation of telephones Is available
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) Water supply: 0,1 The water drain of sewage: 0,1 Electrosupply: 0,1 Heat supply: - 0,1 Gas supply: 0,3
Distance till large settlements and objects of transport infrastructure
Remoteness fromThe nameDistance (km)
Center of the subject of federation The city of Krasnodar 250 km
Highways (regional, federal value) Motorway Labinsk – item Mostovskoy – border KCR 1 km
The nearest railway station Item Mostovskoy 3 km
Nearest tracks Item Mostovskoy 3 km
Airport The city of Krasnodar 250 km
Seaport Of Tuapse 250 km
The additional information about ground area
Special conditions The relief of a site equal, quiet, a level of subsoil waters is not certain, visible exogenous processes (landslips, torrent, swelling capacity, the landing phenomena, water and wind erosion, flooding, watering) on a considered site is not observed, seismicity of area of construction of 8 points, a direction of dominating winds – northeast, southwest.
Cost of rent/repayment of ground area (million rubles) 0,4/0,3