Basic information about ground area |
The planned use of land |
Construction of a trading complex |
Location of the project |
Mostovskoy district |
Address of the location |
Item Mostovskoy, street Perepravnenskaja (microdistrict Air field) |
Cadastral number of quarter |
23:20:0107010 |
Area of the declared (ì2) |
4225 |
Category of the earths |
The Earth of settlements |
Kind of permitted use |
Resolved use of the ground area: shops and shopping centers. A territorial zone — a socially-business zone of local value (roadside service). |
Actual use |
It is not used |
Availability of buildings, structures, constructions |
No |
Authorizations, urban planning documentation |
The general plan Mostovskoy of city settlement developed by Open Company « Project institute of territorial planning », the decision of advice Mostovskogo of city settlement from 12/2/2009 of year 438 |
Information about the proprietor (legal owner) of the ground area |
Proprietor |
State ownership |
Legal owner |
State ownership |
Kind of rights |
- |
Information about burden |
Kind of burden, restrictions |
No |
Area of burden |
No |
The characteristic of existing engineering infrastructure |
Kind of infrastructure | Capacity, diameter | Distance to a connection point (m) |
Electrical supply |
LEP – 10 kw |
37 |
Gas supply |
d=57-76 mm; |
500 |
Water supply |
Existing waterpipe – steel d=100 mm; |
60 |
Water drain |
Existing sewage -and/µ d=150 mm; |
60 |
Installation of telephones |
Is available |
|
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) |
Water supply: 0,1 The water drain of sewage: 0,1 Electrosupply: 0,1 Heat supply: - 0,1 Gas supply: 0,3 |
Distance till large settlements and objects of transport infrastructure |
Remoteness from | The name | Distance (km) |
Center of the subject of federation |
The city of Krasnodar |
250 km |
Highways (regional, federal value) |
Motorway Labinsk – item Mostovskoy – border KCR |
1 km |
The nearest railway station |
Item Mostovskoy |
3 km |
Nearest tracks |
Item Mostovskoy |
3 km |
Airport |
The city of Krasnodar |
250 km |
Seaport |
Of Tuapse |
250 km |
The additional information about ground area |
Special conditions |
The relief of a site equal, quiet, a level of subsoil waters is not certain, visible exogenous processes (landslips, torrent, swelling capacity, the landing phenomena, water and wind erosion, flooding, watering) on a considered site is not observed, seismicity of area of construction of 8 points, a direction of dominating winds – northeast, southwest. |
Cost of rent/repayment of ground area (million rubles) |
0,4/0,3 |