Construction of range TBO in Benokovo rural settlement

Basic information about ground area
The planned use of land Construction of range TBO in Benokovo rural settlement
Location of the project Mostovskoy district
Address of the location Area Mostovsky, Benokovo rural settlement, 13001500 m On a southwest from with. Benokovo
Cadastral number of quarter 23:20:0502001
Area of the declared (ì2) 26 130,6
Category of the earths The Earth agricultural purpose
Kind of permitted use Under accommodation of range TBO with ìóñîðîñîðòèðîâî÷íûì a complex
Actual use It is not used
Availability of buildings, structures, constructions No
Authorizations, urban planning documentation The project of a lay-out and building with. Benokovo, it is approved by decision Kraiispolkom 224 from 25.03.1970ã. General plan Benokovo with/» in development
Information about the proprietor (legal owner) of the ground area
Proprietor State ownership
Legal owner State ownership
Kind of rights -
Information about burden
Kind of burden, restrictions No
Area of burden No
The characteristic of existing engineering infrastructure
Kind of infrastructureCapacity, diameterDistance to a connection point (m)
Electrical supply LEP – 10 kw; 100
Gas supply Installation GRP, d=76 mm 500
Water supply Drilling of chinks, installation of a water tower
Water drain The hydroisolated septic tank
Installation of telephones No
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) Water supply: 3,0 The water drain of sewage: 0,3 Electrosupply: 0,1 Gas supply: 0,025 Access ïóòè:-0,8
Distance till large settlements and objects of transport infrastructure
Remoteness fromThe nameDistance (km)
Center of municipal union Item Mostovskoy 9
Center of the subject of federation The city of Krasnodar 260
Highways (regional, federal value) Motorway Labinsk – item Mostovskoy – border KCR 9
Highways of local value õ. May Day-with. Benokovo 0,8
The nearest railway station Item Mostovskoy 9
Nearest tracks Item Mostovskoy 9
Airport The city of Krasnodar 260
Seaport Of Tuapse 260
The additional information about ground area
Special conditions The relief of a site has the general downturn in a northwest direction, in central and east parts of presence of water is not established, on the western flank the underground subsoil waters lying on depth from 6 up to are revealed 13 m, Capacity watering parts of useful thickness from 1 up to 3 m, Natural outputs of underlaying breeds are absent, seismicity of area of construction of 8 points.
Cost of rent/repayment of ground area (million rubles) 0,05/1,5