Construction of the enterprise on processing a wood in item Psebay

Basic information about ground area
The planned use of land Construction of the enterprise on processing a wood in item Psebay
Location of the project Mostovskoy district
Address of the location Area Mostovsky, item Psebay
Cadastral number of quarter 23:20:0201007
Area of the declared (ì2) 20 000
Category of the earths The Earth of settlements
Kind of permitted use Under accommodation of the enterprise on processing a wood
Actual use It is not used
Availability of buildings, structures, constructions No
Authorizations, urban planning documentation The general plan of item Psebay is developed NPIO «Krasnodargrazhdanproekt» in 1990. The scheme of territorial development of settlements Mostovskogo of area, is approved by the decision of the chapter of administration Mostovskogo of area ¹87 from 12,02.1993ã.
Information about the proprietor (legal owner) of the ground area
Proprietor State ownership
Legal owner State ownership
Kind of rights -
Information about burden
Kind of burden, restrictions No
Area of burden No
The characteristic of existing engineering infrastructure
Kind of infrastructureCapacity, diameterDistance to a connection point (m)
Electrical supply LEP – 10 kw; 100
Gas supply d=57-76 m; 100
Water supply Existing waterpipe – steel d=219 mm; 600
Water drain The hydroisolated septic tank
Installation of telephones Is available
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) Water supply: 0,03 The water drain of sewage: 0,05 Electrosupply: 0,01 Gas supply: 0,025
Distance till large settlements and objects of transport infrastructure
Remoteness fromThe nameDistance (km)
Center of municipal union Item Mostovskoy 30
Center of the subject of federation The city of Krasnodar 280
Highways (regional, federal value) Labinsk - item Mostovskoy-border of Karachaevo-Circassian of republic About 2 km.
The nearest railway station With. Shedok 9
Nearest tracks With. Shedok 9
Airport The city of Krasnodar 280
Seaport Of Tuapse 280
The additional information about ground area
Special conditions The relief of a site equal, quiet, a level of subsoil waters is not certain, visible exogenous processes (landslips, torrent, swelling capacity, the landing phenomena, water and wind erosion, flooding, watering) on a considered site is not observed, seismicity of area of construction of 8 points, a direction of dominating winds – northeast, southwest.
Cost of rent/repayment of ground area (million rubles) 0,09/1,2