Basic information about ground area |
The planned use of land |
Construction of the youth -entertaining center in settlement Mostovskom |
Location of the project |
Mostovskoy district |
Address of the location |
Krasnodar territory, item Mostovskoy, street Clear, southwest area |
Cadastral number of quarter |
23:20:01:10:001 |
Area of the declared (ì2) |
15000,00 |
Category of the earths |
The grounds of settlements |
Kind of permitted use |
Accommodation of the youth -entertaining center |
Actual use |
Pasture |
Availability of buildings, structures, constructions |
No |
Authorizations, urban planning documentation |
The general plan Mostovskoy of city settlement developed by Open Company « Project institute of territorial planning », the decision of advice Mostovskogo of city settlement from 12/2/2009 of year 438 |
Information about the proprietor (legal owner) of the ground area |
Proprietor |
- |
Legal owner |
In charge of administration of municipal formation area Mostovsky |
Kind of rights |
Termless using |
Information about burden |
Kind of burden, restrictions |
No |
Area of burden |
No |
The characteristic of existing engineering infrastructure |
Kind of infrastructure | Capacity, diameter | Distance to a connection point (m) |
Electrical supply |
ÂË-10 ê |
800 |
Gas supply |
d=57-76 mm; |
900 |
Water supply |
Individual source (own chink) |
|
Water drain |
The hydroisolated septic tank |
|
Installation of telephones |
Is available |
|
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) |
Electrosupply: 0,7 Gas supply: 0,8 Water supply: 3,0 The water drain of sewage: 0,3 |
Distance till large settlements and objects of transport infrastructure |
Remoteness from | The name | Distance (km) |
Center of the subject of federation |
The city of Krasnodar |
250 km |
Highways (regional, federal value) |
Motorway Labinsk – item Mostovskoy – border KCR |
2 km |
The nearest railway station |
Item Mostovskoy |
3 km |
Nearest tracks |
Item Mostovskoy |
3 km |
Airport |
The city of Krasnodar |
250 km |
Seaport |
Of Tuapse |
250 km |
The additional information about ground area |
Special conditions |
The relief of a site, a quiet, visible bias from the West on the east, with difference of heights of 0.0-0.5 m., a level of subsoil waters of 3,0 m – 5,0 m. of Landslips, planting soil processes, flooding is not observed; seismicity of area of 8 points; a direction of dominating winds – east, southeast, depth frost a ground – 0,8 meters. |
Cost of rent/repayment of ground area (million rubles) |
By results of the tenders |