Basic information about ground area |
The planned use of land |
Construction of a factory on pouring and packing of potable water in item Psebay |
Location of the project |
Mostovskoy district |
Address of the location |
Area Mostovsky, item Psebay, southeast part (area of a water-fence) |
Cadastral number of quarter |
23:20:0304001 |
Area of the declared (ì2) |
37000 |
Category of the earths |
The Earth of settlements |
Kind of permitted use |
Under accommodation of industrial targets |
Actual use |
It is not used |
Availability of buildings, structures, constructions |
No |
Authorizations, urban planning documentation |
The general plan of item Psebay is developed NPIO «Krasnodargrazhdanproekt» in 1990. The scheme of territorial development of settlements Mostovskogo of area, is approved by the decision of the chapter of administration Mostovskogo of area ¹87 from 12,02.1993ã. |
Information about the proprietor (legal owner) of the ground area |
Proprietor |
State ownership |
Legal owner |
State ownership |
Kind of rights |
- |
Information about burden |
Kind of burden, restrictions |
No |
Area of burden |
No |
The characteristic of existing engineering infrastructure |
Kind of infrastructure | Capacity, diameter | Distance to a connection point (m) |
Electrical supply |
LEP – 10 kw; |
100 |
Gas supply |
d=57-76 m; |
100 |
Water supply |
Existing waterpipe d=200 mm; |
600 |
Water drain |
The hydroisolated septic tank |
|
Installation of telephones |
Is available |
|
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) |
Water supply: 0,03 The water drain of sewage: 0,05 Electrosupply: 0,01 Gas supply: 0,025 |
Distance till large settlements and objects of transport infrastructure |
Remoteness from | The name | Distance (km) |
Center of municipal union |
Item Mostovskoy |
40 |
Center of the subject of federation |
The city of Krasnodar |
290 |
Highways (regional, federal value) |
Motorway Labinsk – item Mostovskoy– border KCR |
2 |
The nearest railway station |
With. Shedok |
9 |
Nearest tracks |
With. Shedok |
9 |
Airport |
The city of Krasnodar |
290 |
Seaport |
Of Tuapse |
290 |
The additional information about ground area |
Special conditions |
The relief of a site equal, quiet, a level of subsoil waters is not certain, visible exogenous processes (landslips, torrent, swelling capacity, the landing phenomena, water and wind erosion, flooding, watering) on a considered site is not observed, seismicity of area of construction of 8 points, a direction of dominating winds – northeast, southwest. |
Cost of rent/repayment of ground area (million rubles) |
0,3/2,1 |