Construction of a multiroom apartment house with a children\'s playground of item Mostovskoy, Gogol\'s street

Basic information about ground area
The planned use of land Construction of a multiroom apartment house with a children\'s playground of item Mostovskoy, Gogol\'s street
Location of the project Mostovskoy district
Address of the location Item Mostovskoy, Gogol\'s street (area SOSH ¹28)
Cadastral number of quarter 23:20:0101011:10
Area of the declared (ì2) 9028
Category of the earths The Earth of settlements
Kind of permitted use Zone of a housing estate
Actual use It is not used
Availability of buildings, structures, constructions No
Authorizations, urban planning documentation The general plan Mostovskoyof city settlement developed by Open Company « Project institute of territorial planning », the decision of advice Mostovskogo of city settlement from 12/2/2009 of year 438
Information about the proprietor (legal owner) of the ground area
Proprietor State ownership
Legal owner State ownership
Kind of rights -
Information about burden
Kind of burden, restrictions No
Area of burden No
The characteristic of existing engineering infrastructure
Kind of infrastructureCapacity, diameterDistance to a connection point (m)
Electrical supply LEP – 10 kw 20
Gas supply d=57-76 mm; 100
Water supply Existing waterpipe – steel d=100 mm; 20
Water drain Existing sewage -and/µ d=150 mm; 20
Installation of telephones Is available
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) Water supply: 0,03 The water drain of sewage: 0,03 Electrosupply: 0,2 Heat supply: - 0,3 Gas supply: 0,5
Distance till large settlements and objects of transport infrastructure
Remoteness fromThe nameDistance (km)
Center of the subject of federation The city of Krasnodar 250
Highways (regional, federal value) Labinsk - item Mostovskoy-border of Karachaevo-Circassian of republic About 3 km.
The nearest railway station Item Mostovskoy 3
Nearest tracks Item Mostovskoy 2
Airport The city of Krasnodar 250
Seaport Of Tuapse 250
The additional information about ground area
Special conditions The relief of a site equal, quiet, a level of subsoil waters is not certain, visible exogenous processes (landslips, torrent, swelling capacity, the landing phenomena, water and wind erosion, flooding, watering) on a considered site is not observed, seismicity of area of construction of 8 points, a direction of dominating winds – northeast, southwest.
Cost of rent/repayment of ground area (million rubles) 0,4/0,3