Construction of a multiroom apartment house with a children\'s playground of item Mostovskoy, Gogol\'s street

Basic information about ground area
The planned use of land Construction of a multiroom apartment house with a children\'s playground of item Mostovskoy, Gogol\'s street
Location of the project Mostovskoy district
Address of the location Item Mostovskoy, Gogol\'s street (area SOSH 28)
Cadastral number of quarter 23:20:0101011:10
Area of the declared (2) 9028
Category of the earths The Earth of settlements
Kind of permitted use Zone of a housing estate
Actual use It is not used
Availability of buildings, structures, constructions No
Authorizations, urban planning documentation The general plan Mostovskoyof city settlement developed by Open Company Project institute of territorial planning , the decision of advice Mostovskogo of city settlement from 12/2/2009 of year 438
Information about the proprietor (legal owner) of the ground area
Proprietor State ownership
Legal owner State ownership
Kind of rights -
Information about burden
Kind of burden, restrictions No
Area of burden No
The characteristic of existing engineering infrastructure
Kind of infrastructureCapacity, diameterDistance to a connection point (m)
Electrical supply LEP 10 kw 20
Gas supply d=57-76 mm; 100
Water supply Existing waterpipe steel d=100 mm; 20
Water drain Existing sewage -and/ d=150 mm; 20
Installation of telephones Is available
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) Water supply: 0,03 The water drain of sewage: 0,03 Electrosupply: 0,2 Heat supply: - 0,3 Gas supply: 0,5
Distance till large settlements and objects of transport infrastructure
Remoteness fromThe nameDistance (km)
Center of the subject of federation The city of Krasnodar 250
Highways (regional, federal value) Labinsk - item Mostovskoy-border of Karachaevo-Circassian of republic About 3 km.
The nearest railway station Item Mostovskoy 3
Nearest tracks Item Mostovskoy 2
Airport The city of Krasnodar 250
Seaport Of Tuapse 250
The additional information about ground area
Special conditions The relief of a site equal, quiet, a level of subsoil waters is not certain, visible exogenous processes (landslips, torrent, swelling capacity, the landing phenomena, water and wind erosion, flooding, watering) on a considered site is not observed, seismicity of area of construction of 8 points, a direction of dominating winds northeast, southwest.
Cost of rent/repayment of ground area (million rubles) 0,4/0,3