Basic information about ground area |
The planned use of land |
Construction of a multiroom apartment house with a children\'s playground of item Mostovskoy, Gogol\'s street |
Location of the project |
Mostovskoy district |
Address of the location |
Item Mostovskoy, Gogol\'s street (area SOSH ¹28) |
Cadastral number of quarter |
23:20:0101011:10 |
Area of the declared (ì2) |
9028 |
Category of the earths |
The Earth of settlements |
Kind of permitted use |
Zone of a housing estate |
Actual use |
It is not used |
Availability of buildings, structures, constructions |
No |
Authorizations, urban planning documentation |
The general plan Mostovskoyof city settlement developed by Open Company « Project institute of territorial planning », the decision of advice Mostovskogo of city settlement from 12/2/2009 of year 438 |
Information about the proprietor (legal owner) of the ground area |
Proprietor |
State ownership |
Legal owner |
State ownership |
Kind of rights |
- |
Information about burden |
Kind of burden, restrictions |
No |
Area of burden |
No |
The characteristic of existing engineering infrastructure |
Kind of infrastructure | Capacity, diameter | Distance to a connection point (m) |
Electrical supply |
LEP – 10 kw |
20 |
Gas supply |
d=57-76 mm; |
100 |
Water supply |
Existing waterpipe – steel d=100 mm; |
20 |
Water drain |
Existing sewage -and/µ d=150 mm; |
20 |
Installation of telephones |
Is available |
|
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) |
Water supply: 0,03 The water drain of sewage: 0,03 Electrosupply: 0,2 Heat supply: - 0,3 Gas supply: 0,5 |
Distance till large settlements and objects of transport infrastructure |
Remoteness from | The name | Distance (km) |
Center of the subject of federation |
The city of Krasnodar |
250 |
Highways (regional, federal value) |
Labinsk - item Mostovskoy-border of Karachaevo-Circassian of republic |
About 3 km. |
The nearest railway station |
Item Mostovskoy |
3 |
Nearest tracks |
Item Mostovskoy |
2 |
Airport |
The city of Krasnodar |
250 |
Seaport |
Of Tuapse |
250 |
The additional information about ground area |
Special conditions |
The relief of a site equal, quiet, a level of subsoil waters is not certain, visible exogenous processes (landslips, torrent, swelling capacity, the landing phenomena, water and wind erosion, flooding, watering) on a considered site is not observed, seismicity of area of construction of 8 points, a direction of dominating winds – northeast, southwest. |
Cost of rent/repayment of ground area (million rubles) |
0,4/0,3 |