Basic information about ground area |
The planned use of land |
Construction of an autocamping in item Nikitino |
Location of the project |
Mostovskoy district |
Address of the location |
Area Mostovsky, Psebay city settlement in km to the north of item Nikitino |
Cadastral number of quarter |
23:20:0212001 |
Area of the declared (ì2) |
20 000 |
Category of the earths |
The Earth wood fund |
Kind of permitted use |
Recreational zone |
Actual use |
It is not used |
Availability of buildings, structures, constructions |
No |
Authorizations, urban planning documentation |
The scheme of territorial development of settlements Mostovskogo of area, is approved by the decision of the chapter of administration Mostovskogo of area ¹87 from 12,02.1993ã. |
Information about the proprietor (legal owner) of the ground area |
Proprietor |
State ownership |
Legal owner |
State ownership |
Information about burden |
Kind of burden, restrictions |
No |
Area of burden |
No |
The characteristic of existing engineering infrastructure |
Kind of infrastructure | Capacity, diameter | Distance to a connection point (m) |
Electrical supply |
No |
|
Gas supply |
No |
|
Water supply |
Own chink |
|
Water drain |
The hydroisolated septic tank |
|
Installation of telephones |
No |
|
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) |
Water supply: 1,0 The water drain of sewage: 0,5 Installation of telephones: installation of a tower of cellular communication |
Distance till large settlements and objects of transport infrastructure |
Remoteness from | The name | Distance (km) |
Center of the subject of federation |
The city of Krasnodar |
310 |
Highways (regional, federal value) |
Labinsk - item Mostovskoy -border of Karachaevo-Circassian of republic |
Nearby 22 |
The nearest railway station |
With. Shedok |
47 |
Nearest tracks |
With. Shedok |
47 |
Airport |
The city of Krasnodar |
310 |
Seaport |
Of Tuapse |
310 |
The additional information about ground area |
Special conditions |
The relief of a site equal, quiet, a level of subsoil waters is not certain, visible exogenous processes (landslips, torrent, swelling capacity, the landing phenomena, water and wind erosion, flooding, watering) on a considered site is not observed, seismicity of area of construction of 8 points, a direction of dominating winds – northeast, southwest. |
Cost of rent/repayment of ground area (million rubles) |
By results of the tenders |