Basic information about ground area |
The planned use of land |
Housing complex from 150 houses type |
Location of the project |
Leningradskiy district |
Address of the location |
Krasnodarskiy edge, cl. Leningrad south-east part |
Cadastral number of quarter |
23:19:0105000: |
Area of the declared (ì2) |
150000 kv.m |
Category of the earths |
Lands of the populated points |
Kind of permitted use |
Is Not determined |
Actual use |
Is Not used |
Availability of buildings, structures, constructions |
Objects to premises are absent |
Authorizations, urban planning documentation |
The General plan cl. Leningrad. It Is Designed OAO \"ITRKK\" in 2007 |
Information about the proprietor (legal owner) of the ground area |
Proprietor |
state property. |
Legal owner |
The Administration of the municipal formation Leningrad region. |
Information about burden |
Kind of burden, restrictions |
Burdenning are absent |
The characteristic of existing engineering infrastructure |
Kind of infrastructure | Capacity, diameter | Distance to a connection point (m) |
Electrical supply |
LEP 10 sq, 35 sq |
in border of the area |
Gas supply |
gasmain of the average pressure ?- 219ìì, depth 1,0ì |
55 m |
Water supply |
O-150ìì asb.c., depth 1,4ì |
90 m |
Water drain |
Local forms buildings |
according to designed to documentation |
Installation of telephones |
depth 0,7ì |
50 m |
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) |
5,989 |
Distance till large settlements and objects of transport infrastructure |
Remoteness from | The name | Distance (km) |
Center of municipal union |
cl. Leningrad |
1 (km) |
Center of the subject of federation |
city Krasnodar |
187 (km) |
Highways (regional, federal value) |
marginal |
1 (km) |
The nearest railway station |
cl. Starominskaya |
31 (km) |
Nearest tracks |
cl. Leningrad |
6 |
Airport |
g.ROSTOV-on-Don |
127 (km) |
Seaport |
g.Eysk |
103 (km) |
The additional information about ground area |
Special conditions |
Relief of the area - calm, water table -5,6ì, dominating direction winds - northeasterly. |
Cost of rent/repayment of ground area (million rubles) |
1,16925 |