Basic information about ground area |
The planned use of land |
The Trade complex |
Location of the project |
Leningradskiy district |
Address of the location |
Krasnodarskiy edge, Leningrad region, h.White, str.October |
Cadastral number of quarter |
23:19:0302017: |
Area of the declared (м2) |
2448 kv.m |
Category of the earths |
The Lands of the populated points |
Kind of permitted use |
The Waistcoat zone (the construction of the trade complex) |
Actual use |
Is Not used |
Availability of buildings, structures, constructions |
The Objects to premises are absent |
Authorizations, urban planning documentation |
The General plan 1977г. \"Kraykolhozproekt\" |
Information about the proprietor (legal owner) of the ground area |
Proprietor |
state sobstvennosti. |
Legal owner |
The Administration of the municipal formation Leningrad rayon. |
Information about burden |
Kind of burden, restrictions |
Burdenning are absent |
The characteristic of existing engineering infrastructure |
Kind of infrastructure | Capacity, diameter | Distance to a connection point (m) |
Electrical supply |
LEP 10 sq |
3 m |
Gas supply |
?-250 steel, height 3м |
127 m |
Water supply |
?-100 asbc. depth 1,2м |
15 m |
Water drain |
The Local forms очистных buildings |
according to designed to documentation |
Installation of telephones |
the depth 0,7м |
on territory area |
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) |
0,361 |
Distance till large settlements and objects of transport infrastructure |
Remoteness from | The name | Distance (km) |
Center of municipal union |
cl. Leningrad |
20 km |
Center of the subject of federation |
the city Krasnodar |
207 km |
Highways (regional, federal value) |
marginal |
10 |
Highways of local value |
|
- |
The nearest railway station |
cl. Krylovskaya Krylovskogo region |
9 km |
Nearest tracks |
st.Krylovskaya Krylovskogo region |
9 km |
Airport |
g.ROSTOV-on-Don |
138 km |
Seaport |
g.Eysk |
120 km |
The additional information about ground area |
Special conditions |
The Relief of the area - calm, water table -4,5м, dominating direction winds - northeasterly. |
Cost of rent/repayment of ground area (million rubles) |
0,0687 |