Building gas of turbine power station

Basic information about ground area
The planned use of land Building gas of turbine power station
Location of the project Labinskiy district
Address of the location Labinsk, northern part, an industrial territorial zone;
Cadastral number of quarter 23:46:0102043:23
Area of the declared (́2) 50000,0 from the ground area cadastral number 23:46:0102043:23 a total area of 104400 sq.m.
Category of the earths The earths of settlements;
Kind of permitted use For agricultural use
Actual use It is not used
Availability of buildings, structures, constructions no
Authorizations, urban planning documentation Management on maintenance of town-planning activity, building planning and architecture from April, 19th 2010 ă
Information about the proprietor (legal owner) of the ground area
Proprietor State ownership
Legal owner Administration MO Labinsk area
Kind of rights The free earths MO Labinsk area
Information about burden
Kind of burden, restrictions no
Area of burden no
The characteristic of existing engineering infrastructure
Kind of infrastructureCapacity, diameterDistance to a connection point (m)
Electrical supply 0,4 kW 50
Gas supply 110 mm 1100
Water supply Artesian chink 30
Water drain - -
Installation of telephones - -
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) 45.2
Distance till large settlements and objects of transport infrastructure
Remoteness fromThe nameDistance (km)
Center of municipal union The city of Labinsk -
Center of the subject of federation The city of Krasnodar 180
Highways (regional, federal value) Motorway of federal value «the Entrance by Maikop from a highway"caucasus" 0.05
Highways of local value Adjoining roads with asphalt and gravel a covering, 0.1
The nearest railway station Station Labinsk 2.5
Nearest tracks - 2
Airport The city of Krasnodar 180
Seaport Tuapse 160
The additional information about ground area
Special conditions Seismicity of area of 7 points
Cost of rent/repayment of ground area (million rubles) For building: 0,768 / year; After delivery in operation: 0,854 / year;
Notes Cost of maintenance of the ground area an engineering infrastructure by the integrated calculations