Basic information about ground area |
The planned use of land |
Building gas of turbine power station |
Location of the project |
Labinskiy district |
Address of the location |
Labinsk, northern part, an industrial territorial zone; |
Cadastral number of quarter |
23:46:0102043:23 |
Area of the declared (́2) |
50000,0 from the ground area cadastral number 23:46:0102043:23 a total area of 104400 sq.m. |
Category of the earths |
The earths of settlements; |
Kind of permitted use |
For agricultural use |
Actual use |
It is not used |
Availability of buildings, structures, constructions |
no |
Authorizations, urban planning documentation |
Management on maintenance of town-planning activity, building planning and architecture from April, 19th 2010 ă |
Information about the proprietor (legal owner) of the ground area |
Proprietor |
State ownership |
Legal owner |
Administration MO Labinsk area |
Kind of rights |
The free earths MO Labinsk area |
Information about burden |
Kind of burden, restrictions |
no |
Area of burden |
no |
The characteristic of existing engineering infrastructure |
Kind of infrastructure | Capacity, diameter | Distance to a connection point (m) |
Electrical supply |
0,4 kW |
50 |
Gas supply |
110 mm |
1100 |
Water supply |
Artesian chink |
30 |
Water drain |
- |
- |
Installation of telephones |
- |
- |
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) |
45.2 |
Distance till large settlements and objects of transport infrastructure |
Remoteness from | The name | Distance (km) |
Center of municipal union |
The city of Labinsk |
- |
Center of the subject of federation |
The city of Krasnodar |
180 |
Highways (regional, federal value) |
Motorway of federal value «the Entrance by Maikop from a highway"caucasus" |
0.05 |
Highways of local value |
Adjoining roads with asphalt and gravel a covering, |
0.1 |
The nearest railway station |
Station Labinsk |
2.5 |
Nearest tracks |
- |
2 |
Airport |
The city of Krasnodar |
180 |
Seaport |
Tuapse |
160 |
The additional information about ground area |
Special conditions |
Seismicity of area of 7 points |
Cost of rent/repayment of ground area (million rubles) |
For building: 0,768 / year; After delivery in operation: 0,854 / year; |
Notes |
Cost of maintenance of the ground area an engineering infrastructure by the integrated calculations |