Basic information about ground area |
The planned use of land |
Building of a trading complex |
Location of the project |
Labinskiy district |
Address of the location |
Labinsk, motorway Ust-Labinsk - Labinsk - Persistent, to the west ìêð \"Northern\" |
Cadastral number of quarter |
23:46:01 |
Area of the declared (ì2) |
40000,0 |
Category of the earths |
The earths of settlements |
Kind of permitted use |
Principal view of resolved use - individual housing construction |
Actual use |
It is not used |
Availability of buildings, structures, constructions |
no |
Authorizations, urban planning documentation |
Management on maintenance of town-planning activity, building planning and architecture from April, 19th 2010 ã |
Information about the proprietor (legal owner) of the ground area |
Proprietor |
State ownership |
Legal owner |
Administration MO Labinsk area 352500, Labinsk, street Konstantinova, 2 |
Kind of rights |
The free earths MO Labinsk area |
Information about burden |
Kind of burden, restrictions |
no |
Area of burden |
no |
The characteristic of existing engineering infrastructure |
Kind of infrastructure | Capacity, diameter | Distance to a connection point (m) |
Electrical supply |
The electric main 10ê |
50 |
Gas supply |
100 mm |
300 |
Water supply |
200 mm |
800 |
Water drain |
Individual small treatment facilities |
Within a site |
Installation of telephones |
- |
- |
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) |
14.0 |
Distance till large settlements and objects of transport infrastructure |
Remoteness from | The name | Distance (km) |
Center of municipal union |
The city of Labinsk |
- |
Center of the subject of federation |
The city of Krasnodar |
180 |
Highways (regional, federal value) |
Regional value |
1 |
Highways of local value |
Adjoining roads with asphalt and gravel a covering, |
0.1 |
The nearest railway station |
Station Labinsk |
5 |
Nearest tracks |
- |
5 |
Airport |
The city of Krasnodar |
180 |
Seaport |
Tuapse |
160 |
The additional information about ground area |
Special conditions |
Seismicity of area of 7 points |
Cost of rent/repayment of ground area (million rubles) |
For building: 0,00854; |
Notes |
Cost of maintenance of the ground area an engineering infrastructure by the integrated calculations |