Basic information about ground area |
The planned use of land |
Building of welfare projects |
Location of the project |
Labinskiy district |
Address of the location |
352500, Labinsk, crossing of streets Farming - Hibinsky - Stavropol - Tajmyrsky |
Cadastral number of quarter |
23:46: 01 02 040 |
Area of the declared (ì2) |
16000,0 |
Category of the earths |
The earths of settlements |
Kind of permitted use |
Principal view of resolved use - placing of objects of the preschool and full general education |
Actual use |
It is not used |
Availability of buildings, structures, constructions |
no |
Authorizations, urban planning documentation |
Management on maintenance of town-planning activity, building planning and architecture from April, 19th 2010 ã |
Information about the proprietor (legal owner) of the ground area |
Proprietor |
State ownership |
Legal owner |
Administration MO Labinsk area 352500, Labinsk, street Konstantinova, 2 |
Kind of rights |
The free earths MO Labinsk area |
Information about burden |
Kind of burden, restrictions |
no |
Area of burden |
no |
The characteristic of existing engineering infrastructure |
Kind of infrastructure | Capacity, diameter | Distance to a connection point (m) |
Electrical supply |
0,4 êW |
50 |
Gas supply |
63 mm |
50 |
Water supply |
200 mm |
200 |
Water drain |
Has removed |
1300 |
Installation of telephones |
- |
- |
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) |
15.7 |
Distance till large settlements and objects of transport infrastructure |
Remoteness from | The name | Distance (km) |
Center of municipal union |
The city of Labinsk |
- |
Center of the subject of federation |
The city of Krasnodar |
180 |
Highways (regional, federal value) |
Regional value |
1 |
Highways of local value |
Adjoining roads with asphalt and gravel a covering, |
0.1 |
The nearest railway station |
Station Labinsk |
3 |
Nearest tracks |
- |
2 |
Airport |
The city of Krasnodar |
180 |
Seaport |
Tuapse |
160 |
The additional information about ground area |
Special conditions |
Seismicity of area of 7 points |
Cost of rent/repayment of ground area (million rubles) |
0.04 |
Notes |
Cost of maintenance of the ground area an engineering infrastructure by the integrated calculations |