Basic information about ground area |
The planned use of land |
Construction of a hotel complex |
Location of the project |
Kushchevskiy district |
Address of the location |
Krasnodar territory, area Kushchevsky, item Kuschevskaya, street Transport, 36, lengthways federal hightway \"Don\", km 1146+100 (on the right) |
Cadastral number of quarter |
23:17:1405002 |
Area of the declared (ì2) |
8000 |
Category of the earths |
The Earth of settlements |
Kind of permitted use |
For agricultural use |
Actual use |
It is not used |
Availability of buildings, structures, constructions |
No |
Authorizations, urban planning documentation |
General plan Kuschevskaya of rural settlement with reference to a part of territory item Kuschevskaya, approved by the decision of Advice of municipal formation area Kushchevsky from 7/24/2007 ¹ 524, Rules of land tenure and building of municipal for |
Information about the proprietor (legal owner) of the ground area |
Proprietor |
State ownership |
Legal owner |
The property is not differentiated, at the disposal of administration of municipal formation area Kushchevsky |
Kind of rights |
State ownership |
Information about burden |
Kind of burden, restrictions |
Borders of a site to arrange in 50 m from a housing estate and in 75 meters from FHW \"Don\" |
The characteristic of existing engineering infrastructure |
Kind of infrastructure | Capacity, diameter | Distance to a connection point (m) |
Electrical supply |
construction HL- 0,4 êV |
0,4 |
Gas supply |
from gas main on street Ejskaya in diameter 100mm |
0,4 |
Water supply |
a pipe In diameter 100 mm |
0,4 |
Water drain |
construction of local clearing constructions |
construction of local clearing constructions |
Installation of telephones |
connection from communication networks of item street Ejskaya Kushchevskaya |
1,0 |
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) |
1,6 |
Distance till large settlements and objects of transport infrastructure |
Remoteness from | The name | Distance (km) |
Center of municipal union |
Kuschevskaya |
0 |
Center of the subject of federation |
Krasnodar |
220 |
Highways (regional, federal value) |
Federal motorway Ì-4 \"Don\" |
1,0 |
Highways of local value |
«Kuschevskaya-Starominskaya» |
1,0 |
The nearest railway station |
Kuschevka |
5,0 |
Nearest tracks |
The North Caucasian railway |
5,0 |
Airport |
Rostov-on-Don |
80 |
Seaport |
Eysk |
120 |
The additional information about ground area |
Special conditions |
Air temperature - average annual - +9,1 ° W, max - +42°Ñ, minimum-37°S; Frost line of soils – 0,8 m; Ground water table – roughly 6-7 m; Seismicity of region on CNaR and a map of seismic micro dividing into districts – 6 points; Directions of win |
Cost of rent/repayment of ground area (million rubles) |
0.54 |
Notes |
Procedure of translation of the ground area in the grounds of settlements in connection with change of feature of settlement of item Kuschevskaya is carried out |